3
I
CUBE™ Adaptive Defrost Module
2. Orient the
I
CUBE™ module as shown in FIG. 5.
3. Install and fasten the
I
CUBE™ module to the control
board with the screws provided. Be sure to align the
I
CUBE™ module terminals with the terminal fasteners
on the control board when placing. See FIG. 5.
Note:
Gently tighten screws. Do not over-tighten or
stripping may occur.
4. Install and fasten the FM timer onto the
I
CUBE™
module with the screws provided. Be sure to align the
FM timer terminals with the terminal fasteners on the
I
CUBE™ module. See FIG. 5 inset.
FM Timer
Screw
Control Board
Terminal
Fasteners
Bracket
I
CUBE™
Module
FIG. 5
Install the
I
CUBE™ Module (Bracket Shown)
Install the Thermistor Probe
1. Route the length of field-supplied copper wire needed
to connect the thermistor probe from the evaporator
coil to the input lead. (This wire may be 18–14 AWG
shielded or unshielded up to 400 ft (121.92 m) long)
Note:
The field-supplied wires may run along with the
power wires through existing or new conduit.
2. Connect the input lead to the
I
CUBE™ module as
shown in FIG. 6. The input lead may be inserted into
any of the four connectors on the
I
CUBE™ module.
Note:
Make sure the input pins are properly aligned with
the input lead connector.
Input Lead
Input Lead Connectors
FIG. 6
Attach the Input Lead
3. Route the input lead above the tab and around the
I
CUBE™ module as shown in FIG. 7.
4. Cut the input lead to the appropriate length:
–
For enclosure installations, cut the input lead length
to ensure the connection is inside the enclosure as
shown in FIG. 7.
–
For bracket installations, cut the input lead to an
appropriate length inside the condensing unit control
panel.
5. Use the provided wire connectors to connect the input
lead to the routed 18–14 AWG shielded or unshielded
field-supplied wire.
Wire Connector
Input Lead
Route Lead over Tab
Field-Supplied Wire
to Thermistor Probe
FIG. 7
Route the Input Lead