![Interlogix NX-595E Скачать руководство пользователя страница 32](http://html.mh-extra.com/html/interlogix/nx-595e/nx-595e_installation-manual_2076778032.webp)
32
NX-595E Installation Manual
Activation Event:
Select the required event from the drop down list that will
activate the corresponding relay
Activation Time:
Time the relay will be active, options 0 –255
Minutes:
On if output should be timed in minutes; off if timed in seconds
Latch:
On if output should latch; off if output should be timed.
Code Reset:
On if output should stop timing upon code entry; off if output should
follow timer.
Open Schedule:
On if output should only activate between the opening and
closing time
Close Schedule:
On if output should only activate between the closing and
opening time
Invert:
On if output should be inverted
Activation Partitions:
Is used to select the partition(s) the event must occur in
before the output will activate.
Schedule Times:
Sets the Opening / Closing hours and minutes (24 hour
format) and the days of the week the event must occur in before the output will
activate.