background image

Intel Server Board SE7501BR2 Installation and Integration Guide 

Installing the Retention Mechanism 

1.

 

Insert the retention brackets. 

2.

 

Tighten the four retention screws. 

 
 

Applying Thermal Grease 

Apply thermal grease to the processor as shown.  

 
 

Attaching the Heat Sink and Retention Clips 

1.

 

Place the heat sink onto the processor as shown. Heat 
sink styles may differ. 

2.

 

Verify that the tab on the inside of the retention clip 
engages the slot on the heat sink during installation.  

*  The center slot in the clip provides room for side-to-side 

motion while you engage the retention clip slots on each 
side.

 

 

 

 

1. Position both clips as shown. Make sure 
the tab (2) above engages the slot on the 
heat sink base. 

2. Slide the clip in the direction shown. Note 
the location of the center plastic tab. 

 
3. Press downward on the retention clip end 
to engage the side plastic tab. 

4. Snap the other end as shown. 

 

 

NOTE

  

Install both retention clips simultaneously for the easiest installation. 

 

 

15

 

 

Содержание SE7501BR2 - Server Board Motherboard

Страница 1: ...Server Installation and Integration Guide Using the Boxed Intel Xeon Processor and Boxed Intel SE7501BR2 Server Board...

Страница 2: ...COMPLETE FREE FROM DEFECTS OR SAFE FOR ITS INTENDED PURPOSE AND HEREBY DISCLAIM ALL LIABILITIES THEREFOR ANY PERSON MAKING USING OR SELLING SUCH PRODUCT OR TECHNOLOGY DOES SO AT HIS OR HER OWN RISK L...

Страница 3: ...he I O Shield 9 Attaching the Label to the I O Shield 9 Installing the I O Shield 9 Installing Chassis Standoffs 10 Installing the Rubber Bumper 10 Installing the Server Board 10 Installing Memory 11...

Страница 4: ...erial B Cable 20 Cable Routing Intel SC5200 Chassis Base version 20 IDE or SCSI Cables 20 Floppy and Front Panel Cables 20 Cable Routing Intel SC5200 Server Chassis Hot Swap Redundant Power Version 21...

Страница 5: ...r on servers System integrators deploying servers based on boxed Intel SE7501BR2 Server Boards Our intent is to better enable system integrators particularly first time server builders to meet the com...

Страница 6: ...s emf welcome asp id 37 3 Channel Customers can contact Intel customer support toll free at 1 866 655 6565 Non channel customers should use one of the numbers listed at http www intel com support 9089...

Страница 7: ...sit Intel Support at http support intel com support motherboards server se7501br2 Prepare for Assembly 1 Gather tools needed Needle nose pliers Flat blade screwdriver Philips screwdriver Antistatic wr...

Страница 8: ...able parts in the power supply If the power supply is malfunctioning return it to the manufacturer for servicing Electrostatic Discharge ESD CAUTION Perform the procedures in this product guide only a...

Страница 9: ...he back of the chassis The shield has cutouts that match the external I O connectors such as keyboard and mouse Attaching the Gasket to the I O Shield 1 Remove the two backing strips from the gasket 2...

Страница 10: ...ons marked P regardless of whether one or two processo will be installed Standoffs are included with this chassis ndoffs rs Installing the Rubber Bumper e doff he Installing the Server Board 2 ttach t...

Страница 11: ...rchitecture allows the user to mix various sizes of DIMMs between banks DIMMs must be identical within each bank NOTE Use memory that has been tested for compatibility with the server board For a list...

Страница 12: ...r system Do not install a terminator in the SE7501BR2 Server Board If installing a SECOND processor verify that the processors are identical in voltage and speed Do not mix processors of different typ...

Страница 13: ...ip e 1 Position Make sure 2 Slide the own Note 3 Press do engage 4 Snap NOTE Install both retention clips simultaneously for the easiest installation styles may differ Verify that the t engages the sl...

Страница 14: ...alignment triangle mark on the le 3 lling the Boxed Intel Xeon Processor Int S Version Choosing the Processor Socket Power version of the Intel SC5200 Server Cha If only ONE processor is to be used i...

Страница 15: ...ab on the inside of the retention clip engages the slot on the heat sink during installation The center slot in the clip provides room for side to side motion while you engage the retention clip slots...

Страница 16: ...wind tunnel toward the rear of the chassis as shown Attaching the Heat Sink Fan Install the processor wind tunnel center section over the heat sink The plastic tabs on the wind tunnel center section m...

Страница 17: ...retention mechanism 3b 4 Then attach the fan power cable to the corresponding s board CPU fan connector erver 5 Correct assembly should look like this When installing only one processor there is no ne...

Страница 18: ...nections 3 and 4 on the server board Intel SC5200 Server Chassis Hot Swap Redundant Power Version Be sure to attach each system fan to its correspondingly numbered connector on the server board System...

Страница 19: ...onding component is installed A System Fan 6 upper connection G Secondary IDE B System Fan 5 lower connection H Low Voltage Differential LVD SCSI C Intelligent Platform Management Bus IPMB I HDD LED D...

Страница 20: ...taching the two hex screws as shown 3 Attach the other end of the cable to the Serial B connector on the server board See Making Optional Connections to the Server Board on page 19 Cable Routing Intel...

Страница 21: ...on 1 An air duct covers the processor Place the tabs on that air duct into the hinge slots on the plastic fan carrier and lower the duct into the chassis 2 Another air duct covers the PCI slot area of...

Страница 22: ...ront foot are marked F and 1 2 On the back foot the middle hole should face toward the back of the chassis Location holes for the rear foot are marked F Installing into a Rack Rack Mode Installing int...

Страница 23: ...er before finishing up See Installing the Access Cover on page 21 An electrical shock hazard exists if the chassis access cover is not replaced before connecting the chassis AC power 1 Connect the key...

Страница 24: ...el Server Board SE7501BR2 support Web site is http support intel com support motherboards server SE7501BR2 You ll find the System Update Package at the Software and Servers link The System Update Pack...

Страница 25: ...tion and the corresponding steps required to quickly get the server back up and running To get started with Intel Server Management first install the Service Partition then the operating system and fi...

Страница 26: ...ool in the menu on the left side of the screen 3 In the green Make a Selection drop down menu select SMaRT Tool Install Guide Print the Guide and keep it on hand for reference 4 Review the Intel SMaRT...