background image

Minimum Hardware Requirements

 

Memory Type:

 

    Minimum of one 512MB DDR3 1066/1333/1600 MHz UDIMM or one

    1GB DDR3 1066/1333/1600 MHz RDIMM.

 

Processor:

    Intel

® 

Xeon

® 

processor E5-2400 product family.

 

Hard Disk Drives:

 SATA

For a complete list of compatible

 

processors, heatsinks,

 

and memory, see

http://www.intel.com/support.

To avoid integration difficulties and possible board damage, your system must 

meet the following minimum requirements:

2

General Installation Process

The installation instructions in this section are for common components of Intel® Server System 
R2000BB family.

1

Preparing the System

Observe normal ESD (Electrostatic Discharge) 

procedures.

Place your Intel

®

 Server System on a flat anti-static 

surface to perform the following integration procedures. 

Observe ESD procedures before reaching inside to make 

server board connections or install components.

A

B

B

2

Remove the Top Cover

B

Remove the four screws.
Slide cover back and lift upward.

A

IMPORTANT!

Before proceeding 

further, check your 

Intel

®

 Server System 

for disconnected or 

loose cables and 

components that 

may have occurred 

during shipping.

B

A

3

Remove the Air Duct

Carefully push in the two latches on the air duct.

A

Rotate the back edge of the air 

duct up to disengage the two 

tabs from fan bulkhead.

B

4

Remove Processor Heatsink(s)

The heatsink is attached to the server board / processor socket with captive fasteners.

Lift the heatsink straight up.

A

B

C

CAUTION: The heatsink has thermal interface material (TIM) on the underside 

of it.  Use caution so that you do not damage the thermal interface material. 

Use gloves to avoid sharp edges.

Using a #2 Phillips* screwdriver, loosen the four screws located on the 

heatsink corners in a diagonal manner using the following procedure:

Using a #2 Phillips* screwdriver, start with screw 1 and loosen it by 

giving it two rotations and stop. (IMPORTANT: Do not fully loosen.) 
Proceed to screw 2 and loosen it by giving it two rotations and stop. 

Similarly, loosen screws 3 and 4. 
Repeat steps A and B by giving each screw two rotations each time 

until all screws are loosened.

TIM

2

3

1

4

Chassis Front

A

B

C

Содержание R2000BB series

Страница 1: ...familiar with ESD Electrostatic Discharge procedures used during system integration see the complete ESD procedures described in your Service Guide This guide and other supporting documents are locate...

Страница 2: ...This page is intentionally left blank...

Страница 3: ...5 Install Optical Drive 7 Install the Air Duct 7 Remove Add in Card Riser Assembly 7 Install Add in Card s 7 Install Add in Card Riser Assembly 8 Install Rack Handles 8 Install Intel I O Expansion Mo...

Страница 4: ...stem must meet the following operating and configuration guidelines Ambient in let temperature cannot exceed 35 C and should not remain at this maximum level for long periods of time Doing so may affe...

Страница 5: ...RAID C600 Upgrade Key to be functional DIMM channels D F can only be used in dual processor con gurations The CPU 2 heat sink must be installed with or without a processor installed System Features a...

Страница 6: ...NT Before proceeding further check your Intel Server System for disconnected or loose cables and components that may have occurred during shipping B A 3 Remove the Air Duct Carefully push in the two l...

Страница 7: ...rotective cover C D Orientation Posts Orientation Notches A Install the Processor s continued E Close Load Plate and Socket Lever Close the socket lever and ensure that the load plate tab engages unde...

Страница 8: ...assis Each heatsink has four captive fasteners and should be tightened in a diagonal manner using the following procedure Using a 2 Phillips screwdriver start with screw 1 and engage screw threads by...

Страница 9: ...mbering Diagram Drive 0 Primary 24 x 2 5 hard drive bay as shown A A B Press the green latch to unlock Pull out the black lever and slide the carrier out B D C Remove the four screws securing the plas...

Страница 10: ...hown Slide the 2 5 HDD into the plastic drive blank to align the screw holes with the right and left rail Break off the tab on the plastic drive blank Install 2 5 Hard Drive as option Secure the hard...

Страница 11: ...wo tabs on the fan bulkhead A Carefully push in the two latches on the air duct B Push down the air duct into place C Riser Card Connector 11 Remove Add in Card Riser Assembly Grasp the riser assembly...

Страница 12: ...e blue plastic pin into the card guide to secure the add in card NOTE Step A B D and E are only needed when a full length PCI card is installed on the riser assembly Riser Slot 2 is not functional wit...

Страница 13: ...ack Opening Filler A B C Finger Hole A B 19 Install Second Power Supply Module optional A B Use the finger hole to remove the filler panel Insert the power supply module into the power supply cage and...

Страница 14: ...rivers to install On other operating systems browse the DVD folders to locate and install the driver files Download the latest version of the Intel System Management Software from http www intel com g...

Страница 15: ...cket HSBP Power Front Panel USB Front Panel Video CPU 1 Socket USB Serial A RMM4 Lite USB Type A SCU_0 SCU_1 Video NIC4 NIC3 Status LED NIC2 NIC1 Diagnostic LEDs mSATA SSD LP eUSB SSD Chassis Intrusio...

Страница 16: ...te list of accessories and spares can be found at http www intel com support Air Flow CPU2 Socket CPU1 Socket FAN 1 FAN 5 FAN 2 FAN 3 FAN 4 System Fan Connection NOTE System FAN connector 5 on the ser...

Страница 17: ...B PCIe RAID Install into PCIe Riser Card 0 1 B B U Optical Drive SSD Mount on air duct FAN 1 FAN 2 FAN 3 FAN 4 FAN 5 System Cabling Diagram NOTE To activate the port SCU1 4 7 on the server board a pro...

Страница 18: ...4 5 0 1 I 2 C Front Panel Interposer Board PCIe RAID 0 1 Mount on air duct Install into PCIe Riser Card B B U FAN 1 FAN 2 FAN 3 FAN 4 FAN 5 System Cabling Diagram For system with 12 x 3 5 hard drive b...

Страница 19: ...B PCIe RAID Install into PCIe Riser Card 0 1 B B U Optical Drive FAN 1 FAN 2 FAN 3 FAN 4 FAN 5 SSD Mount on air duct System Cabling Diagram For system with 8 x 2 5 hard drive bay NOTE To activate the...

Страница 20: ...el Video Front Panel USB PCIe RAID Install into PCIe Riser Card 0 1 B B U Optical Drive FAN 1 FAN 2 FAN 3 FAN 4 FAN 5 SSD Mount on air duct System Cabling Diagram For system with 16 x 2 5 hard drive b...

Страница 21: ...rd SSD I 2 C I 2 C I 2 C PCIe RAID Install into PCIe Riser Card 0 1 8 x 2 5 HSBP Mount on air duct B B U FAN 1 FAN 2 FAN 3 FAN 4 FAN 5 System Cabling Diagram For system with 24 x 2 5 hard drive bay NO...

Страница 22: ...G48801 002...

Отзывы: