Intel® Server System M50CYP1UR Family System Integration and Service Guide
117
2.
Place the front cushion (iPN K65031-001) on the left end of the inner box. Place the rear cushion
(K65006-001) on the right end of the inner box. Then, place bottom foam K75566-001 in the middle. See
the following figure.
3.
Pack the server system with red EPE sheet (iPN K58342-001). See the following figure.
4.
Pack the system wrapped with EPE sheet in the EPE bag. Then, place the system on the bottom foam (see
the following figure). Place the top front foam (iPN K65046-001) on the left and the top rear foam (iPN
K65037-001) on the right.
K6
50
31
-0
01
K6
50
06
-0
01
K6
50
46
-0
01
K6
50
37
-0
01