Regulatory Compliance
79
Ensure Electromagnetic Compatibility (EMC)
Compliance
Before computer integration, make sure that the power supply and other modules or
peripherals, as applicable, have passed Class B EMC testing and are marked
accordingly.
Pay close attention to the following when reading the installation instructions for the
host chassis, power supply, and other modules:
•
Product certifications or lack of certifications
•
External I/O cable shielding and filtering
•
Mounting, grounding, and bonding requirements
•
Keying connectors when mating the wrong connectors could be hazardous
If the power supply and other modules or peripherals, as applicable, are not Class B
EMC compliant before integration, then EMC testing may be required on a
representative sample of the newly completed computer.
Содержание DQ33HS
Страница 1: ...Intel Desktop Board DQ33HS Product Guide Order Number E20672 001 ...
Страница 45: ...Installing and Replacing Desktop Board Components 45 Figure 20 Connecting the IDE Cable ...
Страница 62: ...Intel Desktop Board DQ33HS Product Guide 62 ...
Страница 68: ...Intel Desktop Board DQ33HS Product Guide 68 ...
Страница 77: ...Regulatory Compliance 77 Figure 28 Desktop Board DQ33HS China RoHS Material Self Declaration Table ...
Страница 82: ...Intel Desktop Board DQ33HS Product Guide 82 ...