Unvented Mains Pressure System

    The drawing shows a typical installation of a 
    shower mixing valve in conjunction with an 
    unvented hot water system. This type of 
    installation must be carried out in accordance 
    with Part G of the Building Regulations.

    Whilst pressures are theoretically equal 
    (balanced) most unvented hot systems have a 
    pressure reducing valve on the incoming cold 
    water prior to the hot water storage vessel. 
    This means that the hot and cold pressures can 
    be significantly different.

    Most unvented systems use an inlet manifold 
    located directly after the pressure reducing 
    valve.

    It is recommended that the cold supply be taken
    from one of the outlets of the manifold directly to the shower as an independent supply.

    For systems without a manifold unit after the pressure reducing valve and where the cold water
    supply pressure is significantly higher than the hot supply we recommend that a separate 
    pressure reducing valve is fitted to the cold supply, as close as possible to the shower valve 
    and with no draw off points between it and the shower valve.

    Flow regulators are required for installations where a PRV is not fitted to ensure simultaneous 
    demand is accounted for.

Modulating Combi Boiler / Instantaneous Gas Water Heater

    The drawing shows a typical installation of a shower valve in conjunction with a combination 
    boiler. 

    Combi boilers will produce a constant flow of water at a
    temperature within its operating range.

    The hot water flow rates are dependant upon the type of
    boiler / heater used and the temperature rise required 
    to heat the cold water to the required temperature. 

    The cold water flow rates may be much greater as they 
    are generally unrestricted from the mains cold water 
    supply. To ensure relatively balanced flow rates, we 
    recommend that a pressure reducing valve or 6 l/min 
    flow regulator is fitted in the cold water supply pipe.

Manifold

PRV

PRV if

manifold is

not used

Cold Supply direct

from mains

Содержание Nulo CB10032CP

Страница 1: ...tion as accurate as possible We cannot accept any responsibility should it be found that in any respect the information is inaccurate or incomplete or becomes so as a result of further developments or...

Страница 2: ...d at a safe temperature to suit the users The shower is pre set using ideal conditions to 38 C at the stop with a manual push button override to 46 C can be re set to suit site conditions or user pref...

Страница 3: ...t Temperature 85 C Max Inlet Pressure Dynamic 5 bar Pre Set Factory Temp Setting 38 C Min Operating Pressure Dynamic 0 4 bar Temperature Stability 2 C Max Unbalanced Pressure Ratio 5 1 Min Temp Differ...

Страница 4: ...her than the hot supply we recommend that a separate pressure reducing valve is fitted to the cold supply as close as possible to the shower valve and with no draw off points between it and the shower...

Страница 5: ...lt the pump manufacturer s installation requirements Gravity System The drawing shows a typical installation of a shower valve on a gravity supplied system Please note the minimum head pressure requir...

Страница 6: ...plaster or plaster board should all be considered when routing the hot and cold supply pipes The valve requires the supply pipes and wall brackets to have 150mm centres and sufficient copper pipe mus...

Страница 7: ...inside edge of the concealing plates position over the compression faces and press firmly to the wall Installing the Shower Valve The connector 10 check valve 9 filter 8 sealing washer 6 and union nu...

Страница 8: ...ow control 1 and allow the outlet temperature to stabilise from the bottom outlet Temporarily refit the control knob bush 8 and control knob 6 and using a digital thermometer it is possible to increas...

Страница 9: ...have a high quality finish and should be treated with care An occasional wipe with a mild washing up liquid on a soft damp cloth followed by a thorough rinsing is all that is required The nozzles in t...

Страница 10: ...maximum showering temperature is too hot or when set to hot water runs to cold Check the commissioned maximum temperature of the shower valve Check the connections to the valve have not been made in r...

Страница 11: ...Intatec Ltd 2017 10 NOTE drawing for illustration purposes only CB10032CP Fixed Riser Rail Dimensions 150 Ctrs 264 722 to 952 55 410 71 200...

Страница 12: ...0 Item Qty Component 1 1 Riser rail 2 1 Riser rail grub screw 3 1 Handset holder 4 1 Adjustment bracket 5 4 Bracket grub screw 6 1 Adjustment piece 7 1 Wall bracket 8 2 Wall bracket grub screw 9 1 Ove...

Страница 13: ...Intatec Ltd 2017 12 CB10036CP Deluxe Fixed Riser Rail Dimensions NOTE drawing for illustration purposes only 150 Ctrs 264 55 410 250 722 to 952...

Страница 14: ...m Qty Component 1 1 Riser rail 2 1 Riser rail grub screw 3 1 Handset holder 4 1 Adjustment bracket 5 4 Bracket grub screw 6 1 Adjustment piece 7 1 Wall bracket 8 2 Wall bracket grub screw 9 1 Over hea...

Страница 15: ...ithin the markings and using the hole as a template drill a 6mm diameter hole If drilling into ceramic tiles use a ceramic bit To avoid cracking ensure the wall plug is pushed all the way behind the c...

Страница 16: ...ure the conditions of use are appropriate for the valve Introduction The thermostatic shower valve has been specifically designed and manufactured to meet the requirements of BS EN1111 1999 and TMV2 T...

Страница 17: ...99 and also be aware of their responsibility and duty of care to ensure that all aspects of the installation comply with the regulations It has been brought to our attention that flushing water system...

Страница 18: ...e s to within the limits as quoted previously 8 Any thermostatic shower valve must be fitted with a back flow prevention device such as check valves to prevent the cross contamination of supplies The...

Страница 19: ...eratures are established before any attempt to commission 4 Once the supply temperatures are stable and the normal operating conditions are established the shower valve can be commissioned The followi...

Страница 20: ...g performance checks shall be carried out 1 Measure the mixed water temperature at the outlet 2 Carry out the cold water supply isolation test by isolating the cold water supply wait for five seconds...

Страница 21: ...Intatec Ltd 2017 20 Notes...

Страница 22: ...Intatec Ltd 2017 21 Notes...

Страница 23: ...Intatec Ltd 2017 22 Notes...

Страница 24: ...n Staffordshire ST18 0PF Tel 01889 272 180 Fax 01889 272 181 email sales intatec co uk web www intatec co uk E O E 11 08 17 To activate your product warranty please visit www intatec co uk and click o...

Отзывы: