For the latest fitting instructions please visit
www.insigniarange.co.uk
For the latest fitting instructions please visit
www.insigniarange.co.uk
VERY IMPORTANT
Have you got everything? If not please contact your supplying deal-
er
now
. Remember
NEVER
book your tradesman until everything
has arrived, been checked and is present. No replacement / miss-
ing parts can obtained free of charge during or after build only
within the timescale permitted (48 hours after delivery) and always
BEFORE
build.
GOT EVERYTHING AS YOU SHOULD?
GREAT NOW FOR BUILD PLEASE READ ON!
TO START.
Make sure
you have a clear space
, remember when finished and in
place you need access to check your build and able to pull the
shower out should you need to replace anything!
Take the shower tray remove all protective wrapping and fit waste.
If you purchased the fitting kit it is possible this could have been
already been fitted in the tray hole but please note it will only have
been for transport and will need sealing correctly and alignment
for your house waste.
Now on the surface the shower is to finally rest, take the tray and
place accordingly. Level tray with water run off slightly towards the
drain. This is done by adjusting the feet fitted underside
11 12
Check Levels both
Tray Feet