background image

 

Your completed shower should now look like this: 

 

 
 
 
 
 
 
 
 
 
 
 
 

 

HIGHLY RECOMMENDED.  FIT A WATER SOFTENER IF YOU LIVE IN 
A HARD WATER AREA!! 
 
WHY? 

All pipes and valves fitted to this produce are narrow bore which is 
becoming a more and more common practice. The valves inside 
the tap body are ceramic disc type NOT older type rubber seals. 
These and pipes can block VERY fast with calcium. If a supply pipe 
bursts because of this you could be dealing with a very large flood. 
IT DOES HAPPEN! Calcium attacks the flexi supply pipe usually 
around the nut connections first. You will first notice signs of water 
pressure dropping in the shower or water not getting warm 
enough. If this happens pull out the shower check the supply pipes 
by unscrewing and visually looking with the aid of a torch inside 
the end. Any doubt, change both! Never change one! 

For the latest fitting instructions please visit 

www.insigniarange.co.uk

 

TESTING FOR WATER LEAKS 

 

LEAVING SHOWER 24 HOURS AFTER BUILD ALLOWING SEALENT TO 

CURE HAVE YOU BUILT THIS CORRECTLY? FIND OUT NOW. 

 

With all connections tight, the waste and hoses checked, jets fully 
sealed, your shower still around18 inches from its designated final 
resting point and the silicone sealer fully cured (hence leaving for 
24 hours at min) Switch on the overhead shower NOT massage jets 
remember these will fire water out at you and are not suitable for 
checking leaks as they would normally only operate when a person 
is fully in front of them. Just use COLD water setting as hot will 
make cabin misty and condensate thus the inspection becomes 
very difficult. Now on the OUTSIDE inspect each joint, factory seal, 
hose, clip, jet, from one side going round to the back and then oth-
er side finishing at the front. If you have a small leak (normally 
caused through insufficient sealer or air bubble on assemble. Dry 
area thoroughly and reseal on the OUTSIDE. Again remember 
where you see water may not be exactly where the leak is, it could 
have run round to a low point. Never seal anything inside unless 
you feel it necessary and make sure it is thin and neat, remember 
you will see this for the life of your shower! Leave to cure again 
and check. If all good now check shower functions, Jets for back 
massage, foot massage, (if you have one) and finally hand shower, 
check your joints to these functions at the rear again. Never use 
the shower until all checks have been made and the installer is 
100% happy in the knowledge no leaks are present. All good? Now 
push your shower FROM THE BASE NEVER GLASS OR FRAME into 
its final resting position. Now you can shower in the knowledge 
that you have no leaks a job done well and long product life.  
Happy showering! 

For the latest fitting instructions please visit 

www.insigniarange.co.uk

 

29                                                                                                                                                                                                                                                                                          30 

Содержание H88-842

Страница 1: ...ssembly Fitting Instructions For the latest fitting instructions please visit www insigniarange co uk Contents Introduction 3 Tools Required 6 What s in the boxes 7 Staring the Installation 11 Sealing the shower 25 Water Connections 28 Testing for Leaks 30 Safety 31 Warranty Information 32 Spare Part 35 Troubleshooting Help FAQ s 36 Amendments Important 37 For the latest fitting instructions pleas...

Страница 2: ...embly asp No telephone call required just fill in the product number and your postcode and a quote is instant Remember this is for assembly only no connections to your house services are made Assemblers assemble NOT install PLEASE READ ON NOW AND CHECK AGAINST YOUR ABILTY For the latest fitting instructions please visit www insigniarange co uk Thank you for your recent purchase of an Insignia stea...

Страница 3: ...NEVER fix with rigid pipes never fix the unit to the wall DURING BUILD LIKE ALL SHOWERS CORRECT SEALING IS IMPERATIVE ALWAYS FIT EASY TO GET TO TAP VALVES ON BOTH HOT AND COLD WA TER THE SAME AS A DISHWASHER OR WASHING MACHINE THIS PRODUCT SHOULD BE ISOLATED WHEN NOT IN USE NOTE From time to time these showers may have small differ ences from that of these instructions Due to continuous improve me...

Страница 4: ... construction Box 1 Shower tray box 1 1 x Tray 2 2 x Curved rails for the top Bottom 3 1 x waste fitting if purchased Note Protective film should be removed Before starting the installation Box 2 1 1 x slim side panel 2 1 x Large side panel For the latest fitting instructions please visit www insigniarange co uk For the latest fitting instructions please visit www insigniarange co uk 7 8 ...

Страница 5: ...ets and wheel runner pack to include 8 x door stops sometimes prefitted to curved rails bag of screws or nut and bolts 4 x glass offset retainers For the latest fitting instructions please visit www insigniarange co uk Box 4 1 4 x glass panels 2 2 x straight columns in aluminium 2 2 x straight anti splash door trims 3 2 x fixed glass panel flexi seals For the latest fitting instructions please vis...

Страница 6: ...W FOR BUILD PLEASE READ ON TO START Make sure you have a clear space remember when finished and in place you need access to check your build and able to pull the shower out should you need to replace anything Take the shower tray remove all protective wrapping and fit waste If you purchased the fitting kit it is possible this could have been already been fitted in the tray hole but please note it ...

Страница 7: ...to column and glass to tub For QUADRANT SHOWER Take either one of the tinted glass panels Shiny side inside cabin and the column with controls fitted offer onto tray and align panel to column Now nut and bolt together some models self tap screws are used Make certain the panel is correct way up Tip Double your chances of never having a leak Lightly neatly and cleanly silicone on the waterproof sea...

Страница 8: ...ange co uk Happy with this Joints good not pulled out of alignment Yes common sense really and easy to do but always check and check again The quality you put into workmanship now will reflect the performance you with obtain over the coming years Now taking the second tinted glass panel repeat same operation All good Great Now align to the shower tray position where all will fit when completed You...

Страница 9: ... visit www insigniarange co uk Happy with this Good Now repeat with other column and other end and again with curve marked Top You now have a fully built front supporting frame Silicone under bottom waterproof seals and offer the newly built frame to the end of glass panels Top Curved rail showing UP Silicone joint panels to frame first Screw frame to glass side panels as overleaf For the latest f...

Страница 10: ...ay where holes supplied For the latest fitting instructions please visit www insigniarange co uk Assemble glass rack if supplied Assemble the hand shower and the overhead shower You will now have a build as below For the latest fitting instructions please visit www insigniarange co uk 19 20 ...

Страница 11: ... completed dry Sealing trim being placed on glass Now carefully push the trim you have just fixed on the glass into the channel supplied in the straight end column Press home firmly until completely home For the latest fitting instructions please visit www insigniarange co uk Above shows glass in channel neatly pressed fully in place Repeat same procedure the other side You now need to fix the gla...

Страница 12: ...bottom runner correct location Two person operation for ease On the trailing edge of each door fit the long plastic seal if supplied with the seal flap fitting between the door and the inner side of fixed glass panel For the latest fitting instructions please visit www insigniarange co uk NOTE BUTTONS ON PICTURE ABOVE With both doors in place check for smooth running operation and closure firmly m...

Страница 13: ...REMEMBER all items fitted to the column are not finally tightened by the factory and items can also come loose in transit Notice the jet arrangement to the rear Tighten these or even better slacken off the nut first carefully sili cone behind jet and then retighten Again not always required but a very prudent precaution against any future leak Notice pipe clips to all functions TIGHTEN THESE For t...

Страница 14: ...ired Remembering this product is free standing ais designed to be pulled away from the wall the water supply pipes and waste pipe require flexible pipes If you purchased the fitted kit with this shower you will have the required fittings The water supply pipes need to be at least 1 metre long and flexi braided type not speed fit type heating piping For the latest fitting instructions please visit ...

Страница 15: ...head shower NOT massage jets remember these will fire water out at you and are not suitable for checking leaks as they would normally only operate when a person is fully in front of them Just use COLD water setting as hot will make cabin misty and condensate thus the inspection becomes very difficult Now on the OUTSIDE inspect each joint factory seal hose clip jet from one side going round to the ...

Страница 16: ...st fitting instructions please visit www insigniarange co uk Do not use a remote control inside the shower or leave in heavy moisture areas Never clean your shower directly after use especially after steam ing Allow one hour or longer to cool to room temperature Cold water on hot glass increases the risk of glass shattering and in creases the risk of acrylic crazing Never do this Never be tempted ...

Страница 17: ...includes but not limited to carpets floors ceilings walls and other appliances Flooding electrical failure water ingress can all be For the latest fitting instructions please visit www insigniarange co uk avoided by following the instructions supplied with your product Isolate your shower or bath from main electrical supply as you would your TV when not in use and again isolate water supply at tap...

Страница 18: ...s in the UK It is rare an item is out of stock and usually on the shelf All items are courier delivered where possible and 24 hour service in place So you need something and out of warranty just identify it from the instructions to build call Insignia on 0844 800 3069 tell them pay by card over the telephone and en deavour to despatch same day Disclaimer Whilst all information given is checked and...

Страница 19: ...ass frame first than click the rear panels in to place followed by the column last If you fail to follow this instruc tion your build will be incorrect and you will have to start again To recognise if you have the correct model please check the follow ing Does your metal up rights have a grove on the framework as shown below If so then you Must follow the instructions above in connection with the ...

Отзывы: