Orienting the device
1. Run the PoE cable to the desired location of the PoE injector and insert the cable
into the
Data & Power Out
port on the PoE power injector.
2. Take a racheting socket wrench and device/ smartphone with the Inseego Mobile
App to the FW2010e location.
3. Use the Inseego Mobile App and the positioning bolts on the wall mount bracket
to fine tune the horizontal and vertical angle of the FW2010e for the best signal.
4. Tighten both sets of positioning bolts to 15.0 Nm (11 ft/lb).
17