5.Start-up
9
5.
Start-up
Before putting the pump into operation read carefully the instructions on installation given in
Chapter 4.
5.1.
START-UP
carefully. INOXPA will not assume responsibility for any
improper or incorrect use of the equipment.
Do not touch the pump or the piping while it is pumping products at a high temperature.
5.1.1.
Checks to be carried out before putting the pump into operation
•
Fully open the cut-off valve on the discharge pipe.
•
Check that the stator is submerged.
The pump must NEVER rotate without liquid.
•
Check that the rotation direction of the motor is correct.
•
Check that the power supply matches the rating indicated on the motor plate.
5.1.2.
Checks to be carried out on putting the pump into operation
•
Check to make sure that the pump is not making any strange noises.
•
Check to see if the absolute inlet pressure is sufficient, in order to avoid cavitations in the pump. Consult the curve for the
minimum required pressure above the steam pressure (NPSHr).
•
Monitor the delivery pressure.
•
Check that there are no leaks in the sealed areas.
Monitor motor consumption in order to avoid a circuit overload.
Содержание KIBER KVB-25
Страница 2: ......
Страница 3: ......
Страница 16: ...2021 11 8 Technical Specifications 15 8 3 DIMENSIONS ...
Страница 17: ...16 8 Technical Specifications 2021 11 8 4 PUMP SECTION ...
Страница 19: ...NOTES ...