
5
SMC
If an automatic pH regulation system has been installed, the
injection of the acid must take place unconditionally after the cell.
Otherwise, the electrodes will corrode due to the acid contact and
the warranty will be void. Do not place the acid tank near the
chlorinator with insufficient ventilation as the gases will corrode the
electronic components quickly. Any acid containers should be kept
outside of the plant room.
Whenever it is possible, a by
-
pass installation with three valves is recommended. This
allows the amount of water flowing through the cell to be adjusted and the swimming
pool to work with the cell housing disassembled. In any case, when there is a high
flowing single speed pump, the by
-
pass is necessary to reduce the speed of water
through the cell housing to lower the pressure and avoid vibrations.
Although the vertical cell position is recommended, the cell housing may be installed
vertically or horizontally, according to the characteristics of your site. The vertical
position also allows for disassembling the cell without water spillage. Allow enough room
to unscrew the thread and extract the cell once the housing has been installed.
WATER
MUST ENTER THE CELL THROUGH THE HIGHER SIDE OPENING.
A good filtration is essential in salt chlorination. Please, verify that your
filter and filtrating material are in optimal working conditions.
Содержание SMC10
Страница 1: ...smc chlorinator manual 03 21 ...
Страница 18: ......