EBB & FLOW BENCH ASSEMBLY INSTRUCTIONS
STEP #5
Now stand up the leg support on the opposite end of the frame and a
Ʃ
ach the clamps on
each corner on that side as well. Then stand up any leg supports in the middle of the
frame and repeat the steps again un
Ɵ
l the frame is complete (shown on Figure 4a & 4b).
NOTE: Longer tables will require addi
Ɵ
onal leg supports in the middle of the frame so just use the
diagrams a
Ʃ
ached for reference. They will provide spacing requirements
STEP #6
Once the legs are all standing, you
can insert the load bearing plugs
(A4) into the bo
Ʃ
om of all the
welded legs.
(B1 – see Figure 5)
.
Also, install them to the ends of the
stringer pipes on each corner of the
frame
(shown on Figure 6).
INNOVATIVEGROWERSEQUIPMENT.COM
Call 815-991-5010 or email us at sales@innova
Ɵ
vegrowersequipment.com if you have any ques
Ɵ
ons
FOLLOW INSTRUCTIONS BELOW
Έ
CONT.
Ή
FIGUIRE 4a
FIGUIRE 4b
STRINGER PIPE
UNATTACHED
LEG SUPPORT
ATTACH ALL REMAINING
LEG SUPPORTS TO THE
FRAME
FIGUIRE 5
FIGUIRE 6