INNOVATIVEGROWERSEQUIPMENT.COM
Call 815-991-5010 or email us at sales@innova
Ɵ
vegrowersequipment.com if you have any ques
Ɵ
ons
EBB & FLOW BENCH ASSEMBLY INSTRUCTIONS
FOLLOW INSTRUCTIONS BELOW
Έ
CONT.
Ή
STEP #13
Now take the side rail (longer) aluminum pieces and insert the bench cross bar (B3)
ends into the slot lined along the aluminum piece. On benches 5’ or wider you will
have to connect the end frames (E1) as well.
(see Figure 15 and Figure 16)
NOTE: Make sure the pre-drilled holes are posi
Ɵ
oned upward on the bench cross bars
and end frames. No
Ɵ
ce the posi
Ɵ
on of the end frames on Figure 18. (Again - end
frames will only be used for benches 5’ or wider)
FIGUIRE 18
FIGUIRE 16
FIGUIRE 15
Έ
E1
Ή
END FRAME
Έ
ONLY USE ON BENCHES OVER 5 FT
Ή