MCAC-UTSM-2010-10
Test Operation
Installation
15
1. Installation Procedure
Vacuum drying and leakage checking
Additional refrigerant charge
Insulation the joint part of refrigerant pipe
Wiring connection and electric safety checking
Test operation
Refrigerant pipe
installation and insulation
Drainage pipe installation
and insulation
Indoor unit installation
location selection
Outdoor unit installation
location selection
Indoor unit installation
Outdoor unit installation
Refrigerant pipe
installation and insulation
Drainage pipe installation
and insulation
©2015 Innovair Corporation. All Rights Reserved.
www.innovair.com