Installation
14
Installation
INSTALLATION
1.
Installation Procedure...............................................15
2.
Location selection.....................................................16
3.
Indoor unit installation..............................................17
4.
Outdoor unit installation (Top Discharge Unit) .......21
5.
Refrigerant pipe installation .....................................23
6.
Drainage pipe installation.........................................26
7.
Vacuum Drying and Leakage Checking ..................30
8.
Additional refrigerant charge ...................................31
9.
Engineering of insulation .........................................32
10.
Engineering of electrical wiring ...............................33
11.
Test operation............................................................34
©2015 Innovair Corporation. All Rights Reserved.
www.innovair.com