7.2 How to install.
NOTE
: Top rail and Sliding Panels at each side are offset to provide the proper pitch to the rear of
(5/16 ). This is necessary for proper condensed water utilization and drainage. If you are not using the
Side Panels for any reason, this pitch to the rear must be maintained.
1. Place unit on floor, a bench or a table. There is a Left and Right Window Filler Panel- be sure
to use the proper panel for each side. When installed the flange for securing the panel in place to
the window sill will be facing into the room.
A. Hold the Accordion Panel in one hand and gently pull back the center to free the open end. See
Fig.1.
B. Slide the f
ree and (“I” section) of the panel into the cabinet as shown in Fig. 2A, 2B & 3. Slide the
panel down. Be sure to leave enough space to slip the top and bottom of the frame into the rails on
the cabinet.
C. Once the panel has been installed on the side of the cabinet, make sure it sits securely inside
the frame channel by making slight adjustments. Slide the top and bottom ends of the frame into
the top and bottom ends of the frame into the top and bottom rails of the cabinet. Fig.4.
D. Slide the panel all the way in and repeat on the other side.
NOTE: If storm window blocks AC, see Fig. 13.
FIG.3
FIG.4
Содержание RE05C1D1
Страница 1: ...SERVICE MANUAL RE05C1D1 RE05C1M1 RE06C1D1 RE06C1M1 RE08C1D1 RE08C1M1 RE10C1M1 RE12C1D1 RE12C1M1 ...
Страница 12: ...10 5 Wiring Diagram 1 RE05C1M1 RE06C1M1 202021191021 ...
Страница 13: ...11 2 RE12C1D1 RE05C1D1 RE06C1D1 RE08C1D1 202021190003 ...
Страница 23: ...21 8 Operation characteristics 8 1 Cooling operation For mechanical model For remote control model ...