Page 55
MAXIM Installation Instructions
© Mass Electronics Pty Ltd 2011
Appendix A – Using the CT01 Commissioning Tool
A-2.2 Connecting to Sub System Gateway (IG01)
When you connect the CT01 to the Innotech Sub System Gateway (IG01) using the provided adaptor
cable, the CT01 can communicate with all subsystem controllers on that network that are connected
to the IG01, as illustrated in Figure A-2 below.
Figure A-2:
Connecting the CT01 to a Sub System Gateway IG01
The subsystem network must be reconnected as it was before once the commissioning process is complete.
NOTE
Содержание MAXIM 1010
Страница 1: ...MAXIM Series Controllers INSTALLATION INSTRUCTIONS...
Страница 9: ...Chapter 1 Preliminary Information MAXIM Series Controllers INSTALLATION INSTRUCTIONS...
Страница 15: ...MAXIM Series Controllers INSTALLATION INSTRUCTIONS Chapter 2 Mechanical Installation...
Страница 23: ...Chapter 3 Electrical Installation MAXIM Series Controllers INSTALLATION INSTRUCTIONS...
Страница 41: ...Chapter 4 Network Installation MAXIM Series Controllers INSTALLATION INSTRUCTIONS...
Страница 43: ...Chapter 5 Commissioning MAXIM Series Controllers INSTALLATION INSTRUCTIONS...
Страница 53: ...Appendix A Using the CT01 Commissioning Tool MAXIM Series Controllers INSTALLATION INSTRUCTIONS...