
26 | INSTRUCTION MANUAL INNO
PAD
INNO
6.2.1 INSTALLING THE INSTALLATION BOX
1. Remove the template for cavity wall installations from
the packaging, set it up horizontally at the installation site,
and trace the inner lines with a pen (Fig. 13).
2.
Ensure that the wall is free of supply pipes, cables and me-
tal struts at the installation site.
Carefully remove the area
within the markings so as to insert the installation box.
3. Remove the transport lock then take the installation box
out of its packaging.
4. Hold the installation box to the wall opening, taking care
that the „TOP“ marking at the bottom of the box is facing up,
and break out the cable feedthrough.
5.
Ensure that all live cables are disconnected from the
power supply at the installation site!
Feed the power cable
and, if necessary, audio wire through the opening into the
installation box. Take care not to damage the cables.
6. Secure the power cable to the rear of the installation
box with the tension relief.
Tip:
The tension relief can be
adjusted for various cable diameters by rotating the tension
relief lever (Fig. 14).
7.
All electrical installations must be carried out by a
qualified electrician.
Cut the cable to a length of 250 mm
from the tension relief and attach it to the pre-assembled
mains supply in compliance with the connection regulations
(Fig. 15).
8. Fix the audio wire to the audio output on the main board to
feed the audio signal out via cinch cable (NF) (Fig. 15).
9. Insert the installation box in the wall opening with the „TOP“
marking facing up and fix it perpendicularly by screwing
the metal spreaders until you feel a resistance (Fig. 16).
The spreaders automatically move outward when screwing,
tightening against the innercavity wall and thus fixing the
installation box.
6.2.2 INSTALLING THE METAL BASE PLATE
1. Take the metal base plate out of the packaging.
2.
Ensure that all live cables are disconnected from the
power supply at the installation site! All electrical
installations must be carried out by a qualified electrician.
To earth the metal base plate, connect the earth cable to the
earth connection on the rear of the metal base plate.
3. Fit the metal base plate correctly into the recesses in the
installation box and fix it with the medium-sized stop screw
to the corresponding holders (Fig. 17).
6.2 CAVITY WALL INSTALLATION
Figure 14
Figure 13
Figure 16
Figure 17
Figure 15