27
2). Once power connection has been successfully made (this can be verified by checking the
Alarm LED on the Donor Unit and LED indications on the Coverage Unit, the Donor Unit azimuth
should be positioned so that maximum signal level is being received from the BTS. This can be
monitored via the LEDs which indicate the signal strength reading (RSSI).
(The recommended LED RSSI reading is 3 bars)
Содержание Juni JR20 MPE25K
Страница 1: ...VzW MPE25K Installation Manual 2008 04 Draft Ver 0 5...
Страница 21: ...21 6 CU Wall Ceil Mount Installation 6 1 MTG Bracket Image Fig 17 CU MTG Bracket Image Hole Distance...
Страница 36: ...36 Appendix C System Block...
Страница 38: ...38...