29
signal strength while monitoring the LED indications.
Fig. 26 Verifying Reception Status Diagram
4) Once the positioning and direction of the Donor Unit has been finalized, use the DIP Switch
to activate the UL path.
1 2
3
4
5
6
7
8
9 10 11
1 2
3
4
5
6
7
8
9 10 11
Fig. 27 DIP Switch (Uplink Path Activation)
Содержание Juni JR20 MPE25K
Страница 1: ...VzW MPE25K Installation Manual 2008 04 Draft Ver 0 5...
Страница 21: ...21 6 CU Wall Ceil Mount Installation 6 1 MTG Bracket Image Fig 17 CU MTG Bracket Image Hole Distance...
Страница 36: ...36 Appendix C System Block...
Страница 38: ...38...