
ABW2011IQM01_C - Installation and Operation Manual
EN
ES
FR
IT
5. From inside the charger, fasten it using the supplied bolt and washer in the indicated hole.
6. Check that the fastening is correct.
7. Insert the cabling through the accesses in the lower part of the station (see sections
“8.3. Power supply connection process”
).
8. Remove the protective film from the panel.
Once the unit has been installed correctly, the connection process will begin. Make the connections in the
following order:
1. Connection of accessories (optional).
2. AC connection.
27
Installing the unit
Ingeteam
Содержание INGEREV FUSION Street FW1AW
Страница 3: ...ABW2011IQM01_C English EN Espa ol ES Fran ais FR Italiano IT 3 Ingeteam...
Страница 17: ...ABW2011IQM01_C Installation and Operation Manual EN ES FR IT 80 59 63 30 17 Unit description Ingeteam...
Страница 61: ...ABW2011IQM01_C Manual de instalaci n y uso EN ES FR IT 80 59 63 30 61 Descripci n del equipo Ingeteam...
Страница 105: ...ABW2011IQM01_C Manuel d installation et usage EN ES FR IT 80 59 63 30 105 Description de l appareil Ingeteam...
Страница 149: ...ABW2011IQM01_C Manuale d installazione e uso EN ES FR IT 80 59 63 30 149 Descrizione del dispositivo Ingeteam...
Страница 181: ...Notes Notas Remarques Note...
Страница 182: ...Notes Notas Remarques Note...
Страница 184: ...ABW2011IQM01_C 10 2020 Ingeteam Power Technology S A www ingeteam com...