XFE/EPE/HPE 50
XF/EP/HP 60
XF/EP/HP/XP 75-100
ML/MM/MH 37-75
OPERATORS/
INSTRUCTION MANUAL
OPTIONS
Before installation or starting the compressor for the
first time, this manual should be studied carefully to
obtain a clear knowledge of the unit and of the duties
to be performed while operating and maintaining the
unit.
RETAIN THIS MANUAL WITH UNIT.
This Technical manual contains IMPORTANT SAFETY
DATA and should be kept with the air compressor at all
times.
FORM: APDD 696C
July 2002
More Than Air. Answers.
Online answers: http://www.air.irco.com
Phone: 1-800-526-3615
CCN: 80440332 REV: C
Содержание EP 60
Страница 18: ...16 FIGURE 2 5 1 TYPICAL OUTDOOR SHELTERED INSTALLATION ...
Страница 31: ...29 NOTES ...
Страница 44: ...42 7 0 REFERENCE DRAWINGS 7 1 ELECTRICAL SCHEMATIC FULL VOLTAGE 39899794 REV 02 ...
Страница 45: ...43 7 2 ELECTRICAL SCHEMATIC STAR DELTA 39899786 REV 02 ...
Страница 46: ...44 7 3 FOUNDATION PLAN AIR COOLED 39894472 REV 03 ...
Страница 47: ...45 7 4 FOUNDATION PLAN WATER COOLED 39907894 REV 03 ...
Страница 48: ...46 7 5 FOUNDATION PLAN OUTDOOR MOD 39907886 REV 03 ...
Страница 49: ...7 6 BASIC FLOW SCHEMATIC AIR COOLED 39899828 REV 02 47 ...
Страница 50: ...48 7 7 BASIC FLOW SCHEMATIC WATER COOLED 39899836 REV 02 ...
Страница 51: ...49 7 8 TYPICAL SYSTEM FLOW DIAGRAMS TYPICAL SYSTEM FLOW DIAGRAM ...
Страница 52: ...50 7 8 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 53: ...51 7 8 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 54: ...52 7 8 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 55: ...53 7 8 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 59: ...57 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY 9 0 MAINTENANCE RECORD ...
Страница 60: ...DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD 58 ...
Страница 61: ...59 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...
Страница 62: ...60 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...