34
RECOMMENDED BOLT TIGHTENING
CROSS PATTERN
5.8 COOLANT SEPARATOR ELEMENT
To check condition of separator element, run
compressor in full load mode and at rated pressure
and select "SEPARATOR PRESSURE DROP" in
display table. If display says "XX PSI", then no
maintenance is required. If warning light is on and
display says "CHG SEPR ELEMENT" then the
separator should be replaced.
Loosen the fitting that holds the scavenge tube into the
tank and withdraw the tube assembly.
Disconnect blowdown valve from elbow in tank cover.
Disconnect tube from fitting on minimum pressure
check valve. Loosen tube nut on same tube at
aftercooler inlet then swing tube away from tank cover.
Use a suitable wrench and remove the bolts that hold
the tank cover in position. Remove cover by
lifting up and away.
Carefully lift the separator element up and out of the
tank. Discard the faulty element.
Clean the gasket surface on both the tank and its
cover. Exercise care to prevent pieces of the old
gasket from falling down into the tank.
Check the tank to be absolutely certain that no
foreign objects such as rags or tools have been
allowed to fall into the tank. Install replacement
element down into the tank after checking the new
element gaskets for possible damage. Center the
element up within the tank.
Place the tank cover in its correct position and install
bolts. Tighten the bolts in a cross-pattern (Reference
Figure 5.8-1) to prevent over-tightening one side of the
cover. An improperly tightened cover will likely result in
a leak.
Tank Cover Bolt Torque Values
5/8 UNC
150 ft. Ib.(203 N-M)
Inspect tank scavenge screen and orifice. Clean if
necessary following instructions in Section 5.7.
Install scavenge tube down into the tank until the tube
just touches the separator element. Tighten
fittings.
Install the regulation lines in their original position.
Start unit, check for leaks, place in service.
FIGURE 5.8-1
WARNING
!
High pressure air.
Can cause severe injury or death.
Relieve pressure before removing filter
plugs / caps, fittings or covers.
Содержание EP 60
Страница 18: ...16 FIGURE 2 5 1 TYPICAL OUTDOOR SHELTERED INSTALLATION ...
Страница 31: ...29 NOTES ...
Страница 44: ...42 7 0 REFERENCE DRAWINGS 7 1 ELECTRICAL SCHEMATIC FULL VOLTAGE 39899794 REV 02 ...
Страница 45: ...43 7 2 ELECTRICAL SCHEMATIC STAR DELTA 39899786 REV 02 ...
Страница 46: ...44 7 3 FOUNDATION PLAN AIR COOLED 39894472 REV 03 ...
Страница 47: ...45 7 4 FOUNDATION PLAN WATER COOLED 39907894 REV 03 ...
Страница 48: ...46 7 5 FOUNDATION PLAN OUTDOOR MOD 39907886 REV 03 ...
Страница 49: ...7 6 BASIC FLOW SCHEMATIC AIR COOLED 39899828 REV 02 47 ...
Страница 50: ...48 7 7 BASIC FLOW SCHEMATIC WATER COOLED 39899836 REV 02 ...
Страница 51: ...49 7 8 TYPICAL SYSTEM FLOW DIAGRAMS TYPICAL SYSTEM FLOW DIAGRAM ...
Страница 52: ...50 7 8 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 53: ...51 7 8 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 54: ...52 7 8 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 55: ...53 7 8 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 59: ...57 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY 9 0 MAINTENANCE RECORD ...
Страница 60: ...DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD 58 ...
Страница 61: ...59 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...
Страница 62: ...60 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...