![Ingersoll-Rand 4IRJ7N Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/ingersoll-rand/4irj7n/4irj7n_technician-manual_2059107026.webp)
26
III. Engine Servicing Procedures
Spill Port Timing (continued)
Observe the reading on the crank pulley in relation to the timing marks on the gear case cover. Note
crankshafts position and adjust as necessary. Loosen the injection pump cradle bolts and all fuel
lines from pump to injectors (at both ends). Pull the pump away from the block to advance the
timing, push towards the block to retard.
NOTE: Refer to the proper specification sheet for
timing adjustment information.
After spill port is performed, be sure to reassemble all components and install correctly for proper
operation. Refer to appropriate Workshop Manual for procedures and torque specifications.