0.3 DECALS (continued)
7
WARNING
!
Hazardous voltage. Can cause
severe injury or death.
Only use factory supplied inlet for
incoming power. See Operators/
Instruction manual.
WARNING
!
Hazardous voltage. Can cause
severe injury or death.
Disconnect power before servicing.
Lockout/Tagout machine.
Electrical
power inlet.
VOLTAGE DECAL OPTION
INSIDE STARTER BOX
ON RIGHT SIDE
SCHEMATIC DECAL
54425996 Rev. C (75-160 KW) - 2 REQUIRED
39543764 Rev. 04
39540174 Rev. 05
39541354 Rev 03
Instruction Manual.
WARNING
!
Hazardous voltage. Can cause
severe injury or death.
Only use factory supplied inlet for
incoming power. See Operators/
Instruction manual.
39543764 Rev. 03
Instruction Manual.
Compressor Package Data
COMPRESSOR MODEL...............................
CAPACITY......................................................
RATED OPERATING PRESSURE.................
MAX. DISCHARGE PRESSURE...................
MAX. MODULATE PRESSURE.....................
NOMINAL DRIVE MOTOR............................
NOMINAL FAN MOTOR................................
TOTAL PACKAGE AMPS...............................
VOLTS............................................................
PHASE / HERTZ............................................
CONTROL VOLTAGE.....................................
SERIAL NUMBER..........................................
CONTACTOR AMP. RATING.....................................
ASSEMBLY AMP. RATING........................................
LOCKED ROTOR AMP. RATING OF ASSY. ............
AIR SOLUTIONS GROUP
DAVIDSON, NORTH CAROLINA 28036
WWW.AIR.INGERSOLL-RAND.COM
54425996 Rev.C
m3/MIN
BARG
BARG
BARG
KW
KW
39921804 Rev. B
NOTICE
IEC Starter Overload Setting
1. Full-Voltage Starter (Main or Fan Motor):
Multiply MOTOR nameplate amps by 1.11.
Star-Delta Starter (Main motors only):
Multiply MOTOR nameplate amps by 0.64.
2. Set corresponding overload relay at
this value.
3. Never exceed the following limits:
Full-Voltage Starter: 125% of MOTOR
nameplate amps.
Star-Delta Starter: 72% of MOTOR
nameplate amps.
39557095 Rev.05 (100-200 HP) - 2 REQUIRED
Compressor Package Data
COMPRESSOR MODEL...............................
CAPACITY......................................................
RATED OPERATING PRESSURE.................
MAX. DISCHARGE PRESSURE...................
MAX. MODULATE PRESSURE.....................
NOMINAL DRIVE MOTOR............................
NOMINAL FAN MOTOR................................
TOTAL PACKAGE AMPS...............................
VOLTS............................................................
PHASE / HERTZ............................................
CONTROL VOLTAGE.....................................
SERIAL NUMBER..........................................
CONTACTOR AMP. RATING.....................................
ASSEMBLY AMP. RATING........................................
LOCKED ROTOR AMP. RATING OF ASSY. ............
AIR SOLUTIONS GROUP
DAVIDSON, NORTH CAROLINA 28036
WWW.AIR.INGERSOLL-RAND.COM
39557095 Rev.05
CFM
PSIG
PSIG
PSIG
H.P.
H.P.
Содержание 100-200
Страница 17: ...FIGURE 2 5 1 TYPICAL OUTDOOR SHELTERED INSTALLATION 15...
Страница 18: ...16 3 0 INTELLISYS INTELLISYS CONTROLLER INGERSOLLrAND INTELLISYS...
Страница 52: ...50 54418074 REV B 8 0 REFERENCE DRAWINGS 8 1 ELECTRICAL SCHEMATIC STAR DELTA...
Страница 53: ...51...
Страница 54: ...52 54622865 REV B 8 2 FOUNDATION PLAN 125 150 HP 90 110KW AIRCOOLED SINGLE STAGE CONTINUED...
Страница 55: ...53 54622865 REV B 8 2 FOUNDATION PLAN 125 150 HP 90 110 KW AIRCOOLED SINGLE STAGE...
Страница 56: ...8 3 FOUNDATION PLAN 200 HP 132 160 KW AIRCOOLED SINGLE STAGE CONTINUED 54622931 REV B 54...
Страница 57: ...8 3 FOUNDATION PLAN 200 HP 132 160 KW AIRCOOLED SINGLE STAGE 54622931 REV B 55...
Страница 58: ...56 8 4 FOUNDATION PLAN 125 150 HP 90 110 KW WATERCOOLED SINGLE STAGE CONTINUED 39925300 REV C...
Страница 59: ...57 8 4 FOUNDATION PLAN 125 150 HP 90 110 KW WATERCOOLED SINGLE STAGE 39925300 REV C...
Страница 60: ...58 8 5 FOUNDATION PLAN 200 HP 132 160 KW WATERCOOLED SINGLE STAGE CONTINUED 39926191 REV C...
Страница 61: ...59 8 5 FOUNDATION PLAN 200 HP 132 160 KW WATERCOOLED SINGLE STAGE 39926191 REV C...
Страница 62: ...60 8 6 FOUNDATION PLAN AIRCOOLED CONTINUED 100 150 HP 75 110 KW TWO STAGE 54622980 REV B...
Страница 63: ...61 54622980 REV B 8 6 FOUNDATION PLAN AIRCOOLED 100 150 HP 75 110 KW TWO STAGE...
Страница 64: ...62 8 7 FOUNDATION PLAN AIRCOOLED CONTINUED 200 HP 132 160 KW TWO STAGE 54623053 REV B...
Страница 65: ...63 54623053 REV B 8 7 FOUNDATION PLAN AIRCOOLED 200 HP 132 160 KW TWO STAGE...
Страница 66: ...64 8 8 FOUNDATION PLAN WATERCOOLED CONTINUED 100 150 HP 75 110 KW TWO STAGE 39925326 REV C...
Страница 67: ...65 8 8 FOUNDATION PLAN WATERCOOLED 100 150 HP 75 110 KW TWO STAGE 39925326 REV C...
Страница 68: ...66 8 9 FOUNDATION PLAN WATERCOOLED CONTINUED 200 HP 132 160 KW TWO STAGE 39926340 REV C...
Страница 69: ...67 8 9 FOUNDATION PLAN WATERCOOLED 200 HP 132 160 KW TWO STAGE 39926340 REV C...
Страница 70: ...68 8 10 FLOW SCHEMATIC AIRCOOLED SINGLE STAGE 54579081 REV A...
Страница 71: ...69...
Страница 72: ...70 8 11 FLOW SCHEMATIC WATERCOOLED 90 F 32 C SINGLE STAGE 54579503 REV A...
Страница 73: ...71...
Страница 74: ...72 8 12 FLOW SCHEMATIC WATERCOOLED 115 F 46 SINGLE STAGE 54579511 REV A...
Страница 75: ...73...
Страница 76: ...74 8 13 FLOW SCHEMATIC AIR COOLED TWO STAGE 54579644 REV A...
Страница 77: ...75...
Страница 78: ...76 8 14 FLOW SCHEMATIC WATERCOOLED 90 F 32 C TWO STAGE 54579693 REV A...
Страница 79: ...77...
Страница 80: ...78 8 15 FLOW SCHEMATIC WATERCOOLED 115 F 46 C TWO STAGE 54579727 REV A...
Страница 81: ...79...
Страница 82: ...80 8 16 TYPICAL SYSTEM FLOW DIAGRAMS TYPICAL SYSTEM FLOW DIAGRAM...
Страница 83: ...81 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Страница 84: ...82 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Страница 85: ...83 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Страница 86: ...84 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Страница 90: ...88 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY 10 0 MAINTENANCE RECORD...
Страница 91: ...89 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD...
Страница 92: ...90 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD...
Страница 93: ...91 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD...