
Roadside Safety Barrier
12
Release 07/22b
Table 4: Installation of Ezy-Guard 4 Z-Posts in Rock
Site Condition
Installation Requirements
Rock is
encountered at
the surface.
Drill a 110-300mm diameter
hole to a depth of 450mm,
install the post in the hole
and backfill.
Rock is
encountered
within 450mm
of the surface.
Drill a 110-300mm diameter
hole 450mm into the rock
or to a minimum total post
embedment depth of
650mm, whichever comes
first, install the post and
backfill.
450
650 min.
0
-450
rock
soil
450
rock
Содержание Ezy-Guard 4
Страница 1: ...Release 07 22b ProductManual www ingalcivil com au...
Страница 21: ...21 Release 07 22b...
Страница 24: ...24 Release 07 22b note acceptance of product variants to be confirmed before installation...
Страница 27: ...27 Release 07 22b...
Страница 28: ...28 Release 07 22b...
Страница 33: ...33 Release 07 22b...