UPS Switch on Procedure in Parallel Mode: 

  

With all the switches and fuses (S1,S2, S3, S4 and S5) in “OFF”  “0” position and with S6 in 
“NORMAL” position.  

           Turn on the parallel connected UPS’s, UPS1 and UPS2 separately as follows: 

 

1. 

Make sure that two UPS’s are properly connected for parallel operation in accordance with 
the diagrams given in “INSTALLATION PROCEDURES” section.  

 

2. 

Turn on the S1 switch (inverter input) into “1” position. By turning on S1 you will see the 
following messages on the LCD panel, 

 

a. “RECTIFIER START” 
b. “INVERTER START” 
c. “STATUS NORMAL” 

 

After these messages the UPS will start running and the green INVERTER LED on the 
front panel will be turned on.

 

 

3. 

Using the UP-DOWN buttons on the front panel select “SETTINGS MENU” on LCD and 
press “ENTER”. 

  When you see “MODE” display, using “+” and “-“ buttons select either one of the 

following operation modes which is suitable for your needs. 

   

4. 

After selecting one of the modes, press “ENTER” until the beep sound stops. 

 

5. 

Turn S1 off (inverter input) and few seconds later, turn it on again. Now the inverter is ready 
to operate in the selected mode.  

 

  Perform the same procedure given above for both UPS’s (UPS1 and UPS2). Make sure 

that you select the same mode for both UPS’s. If you select different modes, then a fault 
signal will be generated.  

  After selecting the operation modes for both devices then perform the following 

procedure: 

 

6. 

Turn on the Battery Circuit Breaker S5 (Optional) or insert the battery fuse, to connect the 
battery group to the UPS for uninterrupted operation. 

 

7. 

Turn on S2 switches (static by-pass)  of both UPS’s. 

 

8. 

When you restart UPS’s again, make sure that the CB1 and CB2 switches on the AC 
distribution panel are in “OFF” position. Then turn on S4 (output) switches of both inverters. 

 
 

ATTENTION :

 VOLTAGE AT THE OUTPUT !!! 

 

9. 

Before going any further, measure the voltage (using an AC voltmeter) between the 
corresponding phase outputs of UPS’s at the CB1 and CB2 contacts on the distribution 
panel. Only after you are sure that there is no voltage difference between the corresponding 
contacts, turn on CB1 and CB2 on the AC distribution panel. 

Now the outputs of the UPS’s are connected in parallel and the parallel system is ready for 
use with AC loads. 

 
 
 

Содержание Pyramid Plus

Страница 1: ...288713405 Operating and Installation manual for PYRAMID PLUS 10 200kVA Uninterruptible Power Systems...

Страница 2: ...288713405...

Страница 3: ...UPS Switch On Procedure 40 to 200kVA 26 5 3 Transfer to Maintenance By Pass Mode 10 to 30kVA 27 5 4 Transfer to Maintenance By Pass Mode 40 to 200kVA 27 5 5 Transfer from Maintenance By Pass to Inver...

Страница 4: ...ERVICE 45 7 3 1 Hardware Configuration 45 7 3 2 Functioning Principle 45 7 3 3 SMART Modem Programming PC modem 45 7 3 4 DUMB Modem Programming 45 7 3 5 DUMB Modem UPS Connection Cable 46 7 4 Dry Cont...

Страница 5: ...ate the unit without grounded source 5 Power cord of the UPS should be routed carefully so that they are not to be walked on 6 Please save or recycle the packaging materials 7 The equipment should be...

Страница 6: ...d only after signaling interconnections have been made BATTERY WARNINGS Risk of electric shock The following precautions have to be taken during the operation on battery Remove watches rings or other...

Страница 7: ...ndling provided that the removable side panel is unscrewed PYRAMID PLUS Battery cabinet UPS cabinet It is possible to use slings provided they are at least 1 5 m long Suitable lifting eyes with nuts c...

Страница 8: ...allation place must be easy to service 2 Install the UPS in a protected area with adequate airflow and free of excessive dust 3 You must therefore allow for a minimum gap of 250 mm behind the unit to...

Страница 9: ...m2 A mm2 A mm2 A mm2 A mm2 A mm2 A mm2 Input Output Cable Terminations U V W N Battery Terminations 10 22A 6 20A 6 19A 6 16A 6 15A 6 14A 6 28A 6 16mm 2 Terminals 16mm 2 Terminals 15 32A 6 30A 6 28A 6...

Страница 10: ...ternal By Pass Supply Connections a The three white cables shown in Figure 3 2 are removed b The three phase neutral cables coming from the split by pass supply are connected to terminals U3 V3 W3 and...

Страница 11: ...etween the UPS output AC output U2 V2 W2 N2 and the load distribution panel 4 Make the connection of the battery groups Please look at the Battery Installation item for it ATTENTION Remove the battery...

Страница 12: ...288713405 9 Figure 3 2 c 40 60 kVA UPS Power Connections Split By Pass Connections Normal Connections B A B A AC AC AC AC...

Страница 13: ...288713405 10 Figure 3 2 d 80 kVA UPS Power Connections Split By Pass Connections Normal Connections B B A A AC AC AC AC...

Страница 14: ...of one UPS must be exactly the same size and length as the cables between the distribution panel and the AC output terminals of the second UPS 4 Make the connection of the battery groups Please look...

Страница 15: ...between the cell surface and any walls A clearance of minimum150 mm should be allowed between the top of the cells and the underside of the shelf above this is necessary for monitoring and servicing t...

Страница 16: ...minals at the UPS cabinet 9 Connect the shielded control cable between the UPS and the battery circuit breaker as in the following Battery circuit Inside of the UPS Breaker box 1 1 ITF3 Board BAC60 Bo...

Страница 17: ...3 b UPS Battery Group Connection With Battery Circuit Breaker OPTIONAL To UPS Cabinet Control Cable Electronically Controlled Battery Circuit Breaker BAC60 1 2 3 CN1 To ITF3 CN3 Battery Circuit Breake...

Страница 18: ...s connections there must be a dedicated serial port ATTENTION The communication cables of this option must be shielded and must install away from the voltage cables The RS232 port at RS330 board and D...

Страница 19: ...ers Figure 4 1 Control and display panel Line If lamp is lit mains is okay Battery If lamp is lit UPS is operating on batteries By pass If lamp is lit static bypass is active and load is connected to...

Страница 20: ...ssible Causes Load on the UPS output is over than max Load capacity This state is maybe continous or short time When this alarm is continous to check loads A10 LINE FAILURE Line failure Possible Cause...

Страница 21: ...ses 1 Change from settings menu A39 PSP FAILURE Power supply is not functioning possibly because either of a wrong phase sequence or rectifier fault A40 CANT FIND PR One of parallel modes is selected...

Страница 22: ...se controller decide to stop system for restart user must be turn off S1 inverter input switch and turn on again WARNING STATUS Some events recorded to log event file stays on LCD PANEL but UPS contin...

Страница 23: ...d percentage OPV output voltages FREQU output frequency IPV input voltages BYP bypass source voltages BATT battery voltage and current etc SAMPLE menu selection If you want to go measures menu use UPS...

Страница 24: ...ower of the UPS VERSION MC1XX Version of UPS FREQUENCY PLL XTAL Frequency generation mode ENTER EXIT Exit from submenu PASSWORD MENU password required System settings ENTER EXIT Exit from submenu SETT...

Страница 25: ...5 BYP 230 232 231 Bypass source voltages 6 IPI 022 010 030 Input currents amperes 7 BATT 405 V 22 1 A Battery voltage and charge current 8 TEMP 030 c Cabinet inside temperature 9 CHARGE LEVEL 100 Bat...

Страница 26: ...n is valid 2 UPS No 001 By using PLUS and MINUS keys you can change number 0 to 3 In parallel operation select different number for each UPS If you select the same number DUBL UPS NUMBER message tells...

Страница 27: ...232 port is installed UPS sends AT command set to modem for installation If the function is completed you must hear a beep sound At the end of this function modem is ready to answer dial up connection...

Страница 28: ...2099 8 ENTER UPDATE Enter update new date and time 9 ENTER EXIT Enter exit from submenu Goto first submenu item 4 11 PASSWORD Menu Items Only authorized person can use this menu incorrect usage of th...

Страница 29: ...6 Turn on the BATT and BATT fuses into 1 ON position By this way it is ensured to connect the battery group to the UPS 7 Your UPS system is ready to use You can start up your load ATTENTION At this s...

Страница 30: ...s without the control functions of the UPS It is used for the UPS maintenance 1 Press on the DOWN button when there is COMMAND MENU message on the front panel of the UPS Then press ENTER button 2 Pres...

Страница 31: ...put S2 static bypass S4 UPS output S5 Battery circuit breaker or battery fuse WARNING Inside the UPS the following points will be on operation By pass AC input mains terminals Maintenance by pass swit...

Страница 32: ...of the UPS Then press ENTER button 2 Press on the DOWN button when there is ENTER INVERTER message on the front panel of the UPS Then press ENTER button for 3 seconds static by pass led off and invert...

Страница 33: ...nnecting relatively unimportant loads But do not connect this load again before the end of autonomy time When the utility power is restored the UPS will return to normal operation and on the front pan...

Страница 34: ...as the spare energy supply In case of an Inverter failure in one of the UPS s the static bypass system of all UPS s go to bypass together If everything returns to normal than the inverters resume the...

Страница 35: ...n the system If two UPSs fail than SB3 static switches shall turn on and load is transferred to bypass This is a 3 level redundancy UPS1 UPS2 UPS2 mains Current sharing is active in this mode Hot Stan...

Страница 36: ...E ups and turn on again A40 CANT FIND PR Parallel mode is selected but main controller could not find parallel control board Select ONLINE mode from SETTING MENU Turn off the ups and turn on again A41...

Страница 37: ...288713405 34 Figure 6 2 Parallel UPS U2 V2 W2 N2 U2 V2 W2 N2 U1 V1 W1 N1 AC INPUT U1 V1 W1 N1 AC INPUT AC OUTPUT AC OUTPUT UPS1 UPS2...

Страница 38: ...288713405 35 Figure 6 3 a POWER CONNECTIONS OF TWO UPS s FOR PARALLEL OPERATION 10 15 20 kVA...

Страница 39: ...288713405 36 Figure 6 3 a POWER CONNECTIONS OF TWO UPS s FOR PARALLEL OPERATION 30 kVA...

Страница 40: ...288713405 37 Figure 6 3 a POWER CONNECTIONS OF TWO UPS s FOR PARALLEL OPERATION 40 60 80 kVA U V W N LOAD AC INPUT 3 PHASE Neutral BATTERY GROUP To be supplied by the customer Neutral BATTERY GROUP...

Страница 41: ...405 38 Figure 6 3 b POWER CONNECTIONS OF TWO UPS s FOR PARALLEL OPERATION 100 120 160 200 kVA U V W N LOAD AC INPUT 3 PHASE Neutral BATTERY GROUP To be supplied by the customer Neutral BATTERY GROUP N...

Страница 42: ...05 39 Figure 6 4 b Switch and Fuse Positions and Signal cable connections for parallel operation 30 kVA Figure 6 4 a Switch and Fuse Positions and Signal cable connections for parallel operation 10 15...

Страница 43: ...4 d Switch and Fuse Positions and Signal cable connections for parallel operation 80 kVA ANALOG DIGITAL Figure 6 4 c Switch and Fuse Positions and Signal cable connections for parallel operation 40 6...

Страница 44: ...288713405 41 Figure 6 4 e Switch and Fuse Positions and Signal cable connections for parallel operation 100 120 160 200 kVA ANALOG DIGITAL...

Страница 45: ...seconds later turn it on again Now the inverter is ready to operate in the selected mode Perform the same procedure given above for both UPS s UPS1 and UPS2 Make sure that you select the same mode fo...

Страница 46: ...utput terminals Now your load is completely supplied by the maintenance by pass supply and the UPS s are not operating WARNING During the maintenance or static by pass the connected loads at the UPS o...

Страница 47: ...llowing commands Switch to BYPASS Switch to INVERTER SOUND on off Adjust UPS time and date Start SIMULATION mode Short BATTERY TEST BATTERY TEST until battery low alarm CANCEL battery test Turn off UP...

Страница 48: ...edded modem connect the UPS to the telephone line 7 3 2 Function Principle The remote operator by means of a PC and a modem device and using the remote connection function of the control software call...

Страница 49: ...d terminals These are LINE FAILURE BATTERY LOW LOAD ON BYPASS BATTERY CB input BATTERY CB output EMERGENCY STOP input 7 5 Remote Monitoring Panel Remote m nitoring panel can be used from 400 meters aw...

Страница 50: ...pe the cover with a dump cloth 3 Check the batteries charge with the manual battery test procedure See Automatic and Manual Battery Test CAUTION It is recommended to test the battery discharging capab...

Страница 51: ...r use of the products The period of validity of the warranty may never exceed 12 months after delivery Replacements repairs or modifications of parts during the warranty period cannot extend the durat...

Отзывы: