P a g e
|
26
Issue No 2
890 HD BF INSTALLATION INSTRUCTIONS
Attach the Zero kit front plate using the 9 x No6 screws provided.
Finish the wall now to the front edge of the sides and bottom of the zero clearance box assembly using
plasterboard and plaster skim. Please note a 26mm gap needs to be maintained between the deflector
plate and the plaster board edge. (
Failure to maintain this gap could result in excessive settlement
cracking
when the appliance is in operation
). This gap will be cover by the outer trim assembly.
Содержание 890 HDBF
Страница 35: ...P a g e 34 Issue No 2 890 HD BF SERVICE FAULT FINDING INSTRUCTIONS...
Страница 36: ...P a g e 35 Issue No 2 890 HD BF SERVICE FAULT FINDING INSTRUCTIONS Maintenance...
Страница 37: ...P a g e 36 Issue No 2 890 HD BF SERVICE FAULT FINDING INSTRUCTIONS...
Страница 38: ...P a g e 37 Issue No 2 890 HD BF SERVICE FAULT FINDING INSTRUCTIONS...
Страница 46: ...P a g e 45 Issue No 2...
Страница 47: ...P a g e 46 Issue No 2...