P a g e
|
34
LT7593 Issue No 1 (03/2017)
890 HD INSTALLATION INSTRUCTIONS
Power lead routing
The power supply for this appliance is provided via AC power adaptor 230 VAC. The main cable
terminates the rear Right hand side of the fire box. The length of the cable provided with the
appliance is 1.65 metres. Care must be taken when siting the fire box not to trap the exposed
main cable within the builders opening.
The cable can be routed using the following two methods,
Method 1
Passing the cable through the side of the chimney breast. It is good practice to run the cable
within a sleeve of at least 15mm internal diameter, sealing the sleeve using a suitable sealant at
the point the sleeve / cable terminates the chimney masonry.
Method 2
Remove a channel out of the outer skin of the Dry / wet plaster of the chimney breast up to the
main power point. Again it is good practice to run the cable within a sleeve of at least 15mm
internal diameter.
With power points that exceed the 1.65 metre distance, an optional 2.0 metre extension cable is
available Part No 7147.
The cable system consists of retro fitting plug sockets which offers the following options. (Please
see figure 5).
Содержание 890 HD
Страница 22: ...P a g e 21 LT7593 Issue No 1 03 2017 890 HD USERS INSTRUCTIONS Place the last log as shown ...
Страница 45: ...P a g e 44 LT7593 Issue No 1 03 2017 890 HD SERVICE FAULT FINDING INSTRUCTIONS Fault Finding Charts ...
Страница 46: ...P a g e 45 LT7593 Issue No 1 03 2017 890 HD SERVICE FAULT FINDING INSTRUCTIONS ...
Страница 47: ...P a g e 46 LT7593 Issue No 1 03 2017 890 HD SERVICE FAULT FINDING INSTRUCTIONS ...
Страница 57: ...P a g e 56 LT7593 Issue No 1 03 2017 ...
Страница 58: ...P a g e 57 LT7593 Issue No 1 03 2017 ...
Страница 59: ...P a g e 58 LT7593 Issue No 1 03 2017 ...