
MRU
Demo Program Manual
Inertial Labs, Inc
TM
Address:
39959 Catoctin Ridge Street, Paeonian Springs, VA 20129 U.S.A.
Tel: +1 (703) 880-4222, Fax: +1 (703) 935-8377
Website:
www.inertiallabs.com
74
For each run the .txt file is created with saved MRU data in the “data”
subdirectory. File name consists of s/n of MRU, indication what MRU angle
was tested (H – heading, P – pitch, R – roll), reference angle, reference
temperature, time of run. For example, file
"106A0016_H(38.22)_T(+27)_1831.txt" corresponds to data saved from the
MRU s/n 106A0016 at Heading accuracy test for target angle 38.22 at
18:31.
Also the file of the report like Accuracy_2010991830.txt is created
where numbers are year, month, day, hours, minutes of performed test.
there are averaged data for each MRU run at accuracy test. In the first
column of this file there is MRU s/n, second column is number of reference
angle starting from zero, 6
th
– 7
th
columns are averaged Heading, Pitch and
Roll measured by MRU.
10.4.2. On-the-fly accuracy test
Step 1. Carefully set MRU by two reference surfaces on platform of the
test bench designed for accuracy check.
Step 2 - Step 7 – Perform Step 1- Step 6 from the item 10.1.
Step 8. Select
“MRU visualization”
in the
“Run”
menu (Fig.3.3) and
then click on the
“
Snapshots
”
preview shown in the Fig.5.2c. Window
shown in the Fig.5.4 will appear.
Step 9. Click the «
Start
»
button. Initial alignment of the MRU will
start. This is signified by the message «Initial alignment. Please wait». Also
a progress bar of initial alignment will appear in the status line of the main
window. During the initial alignment the MRU has to be unmovable relative
to the Earth. After initial alignment completes, see changes in numeric data
of MRU.
Step 10. (Not obligatory) To save MRU data click «
Write
»
button.
See a progress bar of data writing and timer will appear in the status line of
the main window. Note the accuracy test data are written to file *.csv
independedly on saving the MRU main data.
Step 11. When the MRU is set in necessary position and is ready to
save data, click the
“Snapshot”
button. Window shown in Fig.10.15 will
appear.