Industriarmatur SIPP Node 400 Скачать руководство пользователя страница 5

 

 

Manual SIPP Node EN, Juni 2, 2015 

 

 

 

As  soon  as  the  SIPP  Node  400  gets  powered  the  unit initiates  connection  to  SIPP  Warehouse.  When 
connection is established SIPP Node 400 enters standby mode.  

 

In  standby  mode,  SIPP  Node  400  continuously  measures  the  water  level  of  the  pit.  As  long  as 
measured  level  is lower  than  the  preset  start  level,  SIPP  Node  400  stays  in  standby  mode.  The  unit 
reports status information in a so-called heartbeat every hour to the web interface. 

 

The unit starts discharging when the water level in the pit rises above a pre-set starting level and if: 

-

 

The unit has contact with the web interface 

-

 

The temperature is 3-25°C 

-

 

The unit is in standby 

 

Note :

 If the temperature has been below 0 ° C continuously for more than 24 hours , the unit will be suspended until the 

temperature has been continuously above 0 ° C for at least 72h . A device that measures a temperature outside the acceptable 

range will report the status HIBERNATION . 

 

At each discharge, a flow control is done and thereafter, all valves are tested for function and leakage. 
If the unit detects oily water during the discharge process, the valves will switch mode so that the oily 
water is returned to the pit. A leakage test is carried out at each switching. 
 
During  the  discharge  process  the  web  interface  is  continually  updated  to  always  show  the  latest 
information about level and status of the unit. 
 
The discharge ends if:    

-

 

The pit is empty of water/water level is below the stop level 

-

 

The water is too dirty 

-

 

Low flow 

-

 

Leakage test is not approved 

-

 

Unknown cause 
 

 

Each discharge ends with a process to drain the system from water. During purge the mainpump uses 
air to push all remaining water through the system to . 
The unit purge at: 

-

 

The end of each discharge 

-

 

Two hours after each discharge 

-

 

Hard reset (unit loose main power supply) 

-

 

Soft reset (the command RESET is sent to the unit) 

-

 

Every 24h 

 

Note :

 If the device after a hard or soft reset meet the requirements to start a discharge that is done instead of purge . 

  

 

At each discharge a functional test is performed.  The SIPP Node 400 tries to start a discharge up to 
three times before it enters alarm mode. An alarm can be acknowledged by switching the main power 
supply off or a soft reset. 

Содержание SIPP Node 400

Страница 1: ... ...

Страница 2: ... 6 5 SIPP Warehouse 7 6 Maintenance 8 General 8 6 1 Recommended maintenance intervals 8 6 2 Maintenance description for each part 9 6 3 7 Troubleshooting 10 Too low flow 10 7 1 Leakage test 10 7 2 PPM above threshold value 10 7 3 Pump does not start 10 7 4 8 Technical specification 11 General data 11 8 1 SIPP Oil Cell 11 8 2 9 Warranty 12 10 Support 13 11 Appendix I SIPP Node 400 parts 14 12 Appen...

Страница 3: ...if not impossible The statutory requirements of self monitoring demand that each discharge of water from a contaminated environment needs to be measured documented and archived with best available technology To reach a quality assured process with full traceability every discharge should generate a protocol The product SIPP Node consists of a bilge pump and a device for continuous measuring of oil...

Страница 4: ...ure that water is pumped from the pit and through the measuring cell It is important to choose the correct type of pump to meet the requirements for the installation site Important parameters are the pump s suction height capacity and working temperature Filter The filter disperses the oil in the water For dirty pits or pits with a so called sump an external pre filter can be installed However a S...

Страница 5: ... valves are tested for function and leakage If the unit detects oily water during the discharge process the valves will switch mode so that the oily water is returned to the pit A leakage test is carried out at each switching During the discharge process the web interface is continually updated to always show the latest information about level and status of the unit The discharge ends if The pit i...

Страница 6: ...int in the ppm graph is the mean value for 1 minute If SIPP detects ppm over preset limit value and changes valve position this moment is stored as a log position SIPP Node also calculates a number of key figures for the discharge such as amount of discharged water average ppm for the water that was discharge from the pit maximum measured ppm value and more When a discharge is ended SIPP Node auto...

Страница 7: ...owing services are included in the agreement Access to the SIPP Warehouse for one 1 user Alarm management and notification via email Alarm controlled and managed remotely normally within 72h If maintenance or service work is needed notifications are sent out Storage of protocols with full traceability for five years Telephone support during office hours ...

Страница 8: ...tem to exchange information set time and deliver log files The result of a discharge is accessed via the internet directly after performed discharge The address to the web interface is http swh apps iowa se or http www industriarmatur se and click on SIPP Warehouse login All customers get their own login to their connected products Trained service technicians get their own login to those products ...

Страница 9: ...be done by 1 Scan unit QR code enter the access code and then follow the instructions 2 Contact support via SMS telephone or email All other types of service work must be carried out by trained service technicians Only spare parts from IA may be used for the service work Measuring cell 680001 Allen screwdriver 4 mm After 250 m3 of discharged water or 4 years after commissioning Filter unit 665201 ...

Страница 10: ...k the flow direction arrows should be pointing downwards See appendix II for a more detailed description Oil cell Exchange of measuring cell Disconnect the two grey hoses and the electrical connector M12 Use the 4 mm allen screwdriver to remove the two screws holding the oil cell Replace the oil cell with a factory calibrated oil cell When reconnecting the grey hoses make sure that they are pushed...

Страница 11: ...ecking where water comes out during leakage test Commonly the leakage is at one of the solenoid valves or a hose that is not firmly connected The discharge is ended 2 minutes after startup Usually there is oil in the water 5ppm is five teaspoons in one kbm of water Check the status of the pit the water should be clear Water that is colored by for example dust or sand cannot be properly evaluated b...

Страница 12: ...ange Water 1 60 C Temperature range SIPP 20 40 C Weight 28 kg Dimensions 140x30x15mm Table 2 Specification for SIPP Measuring Cell Parameter Specification Measuring range 0 20 ppm Resolution 0 1 ppm Accuracy 1ppm Response time 5 sec Communication RS232 Relative temperature 1 60 C Water temperature 1 60 C Sampling flow 0 5 4 0 litre min Water pressure 0 1 bar 6 bar Power supply 9 VDC Protection cla...

Страница 13: ...e sent to Industriarmatur Sweden AB after contacting support Customer stands risk and transport cost Industriarmatur Sweden AB stands risk and cost for transport back to customer For service outside warranty freight is invoiced For a warranty action to apply the installation should be done according to the Industriarmatur guidelines and the Basic Service and Support Agreement should be signed for ...

Страница 14: ...Manual SIPP Node EN Juni 2 2015 13 Industriarmatur Sweden AB Kämpegatan 16 411 04 Göteborg SWEDEN Phone 46 31 80 95 50 E mail support industriarmatur se Web www industriarmatur se ...

Страница 15: ... bracket 5 Filter clamp 6 Filter unit 7 Hook 8 Circuit breaker 9 Cable gland PG13 10 Flow unit 11 Mounting post 12 Cable tie snap in Richco 13 Pump unit 14 Spiral hose 15 Hose pump filter 150 mm 16 Hose filter oil cell 350 mm 17 Air hose 18 Oil cell 21 Temperature sensor 22 Angled hose connector ...

Страница 16: ... downwards 5 Connect the hoses by pressing the gray connectors firmly into the filter s black connectors 6 Turn on the power and verify that the unit starts a discharge If the water level is too low for an automatic start then force a manual start To manually start the pump scan the QR code and follow Instruction QR code or contact support 7 Verify that there is no leakage in the system and that t...

Страница 17: ...ediately because water cannot be pushed out As it becomes this much water left in the filter this water slowly drips down into the measuring cell and the flow meter If there will be water standing in these units when it gets below freezing there is an imminent risk that the units will freeze 4 The pumped water is dirty The filter will most likely need replacement earlier than recommended 50 m3 Fil...

Страница 18: ...ey are pushed all the way to the bottom of the connector to avoid leakage 7 Turn on the power and verify that the unit starts a discharge If the water level is too low for an automatic start then force a manual start To manually start the pump scan the QR code and follow Instruction QR code or contact support 8 Verify that there is no leakage in the system and that the unit after the start up sequ...

Страница 19: ...t emptied Contact your support for approval of a filter change 3 Check and classify pit status Pit clean Cleaning necessary Algaes in the water Oil on surface Ice on surface Pit bottom frozen 4 Check the water level in the pit Measured water level in mm Action plan Water level over 300mm Contact your support 5 If required filter replacement and calibration of the measuring cell through the exchang...

Отзывы: