10. Replace X2 belt.
11. Measure belt tension (frequency meter) and adjust belt.
12. Replace X3 belt.
13. Measure belt tension (frequency meter) and adjust belt.
14.
Example: Distance between front wall (c) and gantry type receiver (b)
1
Operator side view
2
Rear view (belt side)
a
Tool magazine
b
Gantry type mounting
c
Front wall above main spindle
Replace Z8 gantry type receiver belt.
15. Preparing to measure the belt tension on the Z8 axis. First, move the tool
magazine fully to the right home position. (Follow the documentation
“Operating instructions - Options for the machine - Tool magazine for 6
tools” - Chapter “Important notes and manual operation”). Then move the
gantry-type receiver to a distance of 500 mm (see Figure: Distance between
front wall and gantry type receiver). This value or distance is necessary to
accurately adjust the belt tension.
Maintenance Summary - 4.000 Operating hours
82
Maintenance Instructions
G200.2
DIE078EN - 05.06.2019
Содержание G200.2
Страница 6: ...Table of contents IV Maintenance Instructions G200 2 DIE078EN 05 06 2019 ...
Страница 10: ...Preface 4 Maintenance Instructions G200 2 DIE078EN 05 06 2019 ...
Страница 40: ...Maintenance Summary Care activities 34 Maintenance Instructions G200 2 DIE078EN 05 06 2019 ...
Страница 70: ...Maintenance Summary 2 000 Operating hours 64 Maintenance Instructions G200 2 DIE078EN 05 06 2019 ...
Страница 94: ...Maintenance Summary 4 000 Operating hours 88 Maintenance Instructions G200 2 DIE078EN 05 06 2019 ...
Страница 99: ...Service Interval 5 Years Service Interval 5 Years 93 Maintenance Instructions G200 2 DIE078EN 05 06 2019 ...
Страница 103: ...Service Interval 8 Years Service Interval 8 Years 97 Maintenance Instructions G200 2 DIE078EN 05 06 2019 ...