INSTALLATION INSTRUCTIONS
DROP DOWN PROJECTOR LIFTS
P/N 900411-100-400 & P/N 900411-LCD
5.0 MOUNTING PROJECTOR & CABLING INSTALLATION
ONCE THE PROJECTOR IS MOUNTED IN THE CAGE, ROUTE CABLES THROUGH
GROMETTED PORT PROVIDED ON THE PROJECTOR FOOT PLATE ON THE CAGE
ASSEMBLY.
NOTE:
REMOVE TOP COVER ASSEMBLY OF PROJECTOR HOUSING, TO FACILITATE INTERNAL
ROUTING OF CABLES
ROLLING CABLE TRAY
FOR PROJECTOR CABLES
CONNECTOR FOR
EXTERNAL J-BOX
PORT FOR
PROJECTOR CABLES
COVER OF PROJECTOR
HOUSING
FIGURE 3
THE PROJECTOR LIFT IS PROVIDED WITH A LARGE AREA ROLLING CABLE TRAY FOR
THE PROJECTOR’S POWER & SIGNAL CABLES. TO INSTALL CABLES, UN-ZIP THE TOP OF
THE CABLE TRAY, REMOVE SSTL BAR CLAMPS AT EACH END OF THE TRAY, AND LAY
CABLES SNUGGLY IN THE TRAY.
NOTE:
THERE IS
NO
REASON TO CUT CABLES, REMOVE ENDS, ETC. WHEN INSTALLING
CABLES, USE THE UN-ZIP FEATURE OF THE ROLLING TRAY. AFTER CABLES ARE
INSERTED IN THE ROLLING TRAY AND THE ENDS PASS THROUGH THE GROMETTED
PORT ON THE ENCLOSURE WALL. SECURE CABLES BY CLAMPING EACH END WITH THE
SOFT SEAL SSTL BAR CLAMP AT EACH END OF THE TRAY.
FIGURE 4
CABLE TRAY
SOFT SEAL CABLE CLAMP
PROJECTOR CABLES
- 4 -