Check the following prior to the equipment start-up:
>
the complete and proper assembly of the blower/pump,
>
electrical wiring,
>
tightness of all connected pipes, or hoses,
>
opened close valves on the suction or discharge pipes,
>
correct direction of the gas flow, or direction of the rotor rotation.
The air flow direction is indicated on the suction or discharge branch.
5.2 O
PERATION
INW ring blowers / vacuum pumps are designated for continuous operation. Observe the operating conditions
stated in this manual, particularly section 2 Safety, with emphasis on ambient temperature and gas drawn in.
For interrupted operation, do not exceed the maximum number of starts per hour, which the manufacturer has
determined as 10.
Prevent any liquids or solid objects from entering the equipment. Use an air filter with a permeability less than
40
μm.
The maximum possible pressure difference in the system must not be greater than the maximum pressure
difference of the equipment stated in the catalog sheet on the www.in-eco.eu website or on the product label.
Otherwise the equipment is critically overloaded. The common operating pressure in the system should be at
least 10% lower than the maximum working pressure on the product label or catalog sheet of the equipment.
6 M
AINTENANCE
6.1 I
NSPECTION
Check the INW blower/pump and associated pipes, gas (air) distribution system on a regular basis. In particu-
lar, inspect the temperature of the equipment and gas drawn in, as well as the gas pressure in the pipes.
Check the setting of dust and remove dust which could limit ventilation or cooling.
Operated electrical equipment should be checked and inspected by a qualified employee on a regular basis,
at the latest within the terms specified by the relevant standard.