STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it with an
Axle (#17), two M10 x ¾” Allen Bolts (#36), and two
∅
¾” Washers (#42).
B.) Insert one Foam Tube (#10) halfway through the hole on the Main Frame. Insert two Foam
Tubes halfway through the holes on the Leg Developer (#5). Push six Foam Rolls (#24) onto
the Tubes from both ends. Plug six Foam Roll End Caps (#25) into the Tubes.
C.) Slide the Olympic Sleeve (#20) onto the weight post on the Leg Developer. Attach a Spring
Clip (#22) to the Sleeve.
DIAGRAM 4
27
Содержание MARCY MWB-4300
Страница 5: ...SMITH MACHINE HARDWARE PACK 4 ...
Страница 6: ...SMITH MACHINE HARDWARE PACK 5 ...
Страница 9: ...DIAGRAM 2 8 ...
Страница 14: ...CABLE LOOP DIAGRAM 13 ...
Страница 17: ...16 ...
Страница 19: ...DIAGRAM 9 18 ...
Страница 22: ...EXPLODED DIAGRAM 21 ...
Страница 24: ...MULTI PURPOSE BENCH HARDWARE PACK 23 ...
Страница 30: ...29 ...