STEP 11 (See Diagram 11)
A.) Attach a Long Chain (#45) to the Upper Cable (#36). Attach the Lat Bar (#26) to the
Chain using a C-clip (#44). Adjust the length of the Chain to obtain desired Lat Bar
exercise position. See How to Use on page 18.
B.) Attach a Long Chain (#45) to the Lower Cable (#38). Attach the Arm Curl Handle
(#31) to the Chain using a C-clip (#44). Adjust the length of the Chain to obtain the
desired Arm Curl exercise position. Remove the Chain and the Handle when using
the Leg Developer.
C.) Attach two Weight Stack Covers (#43) to the Top Socket Assemble (#5) and Main
Base Frame (#1). Secure the top with two M10 x ¾” Allen Bolts (#82) and
∅
¾”
Washers (#94). Secure the bottom with two M10 x ¾” Hex Bolts (#100) and
∅
¾”
Washers (#94).
DIAGRAM 11
17
Содержание APEX II
Страница 4: ...3 ...
Страница 12: ...CABLE LOOP DIAGRAM 11 ...
Страница 14: ...DIAGRAM 8 13 ...
Страница 16: ...DIAGRAM 9 15 ...
Страница 21: ...20 ...