![Impex APEX II Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/impex/apex-ii/apex-ii_owners-manual_2049234015.webp)
STEP 9 (See Diagram 9 & Cable Loop Diagram)
A.) Attach the 169” Lower Cable (#38) to the opening on the Leg Developer (#12). Place a
Pulley (#50) in the opening. Secure it with one M10 x 2 3/8” Allen Bolt (#86), two
∅
7/8”
x ½” Pulley Bushings (#68), and one M10 Aircraft Nut (#96).
B.) Draw the Cable underneath the Pulley and towards the back of the machine to the open
bracket on the Main Base Frame (#1). Attach a Pulley to the Bracket then secure it with
one M10 x 1 ¾” Allen Bolt (#87), two
∅
¾” Washers (#94), and one M10 Aircraft Nut
(#96).
C.) Draw the Cable through the opening on the bottom of Front Vertical Beam (#2).
Continue drawing along the Main Base Frame (#1) through the opening on the Butterfly
Pulley Bracket (#19) to the open bracket on the back. Attach a Pulley to the open
bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#87), two
∅
¾” Washers (#94), one 2
7/8” L-shaped Bracket (#98), and one M10 Aircraft Nut (#96).
D.) Draw the Cable underneath the Pulley then pull upward to the Angled Double Pulley
Bracket (#25) previously installed in Step 8. Attach a Pulley to the Bracket and secure
it with one M10 x 1 ¾” Allen Bolt (#87), two
∅
¾” Washers (#94), and one M10 Aircraft
Nut (#96). Pull the Cable around the Pulley and downward.
E.) Attach a Pulley to the cable. Install the Pulley in between a Crossed Double Floating
Pulley Bracket (#24). Draw the Cable around the Pulley and pull upward. Connect a
Short Chain (#46) to the end of the Cable. Let the Bracket hanging for now.
F.) Attach the Short Chain to the Front Vertical Beam (#2) by using a C-clip (#44). Note:
After completing the installation, check the tightness of the cable loop. If the cable is
too loose, shorten the chain.
14
Содержание APEX II
Страница 4: ...3 ...
Страница 12: ...CABLE LOOP DIAGRAM 11 ...
Страница 14: ...DIAGRAM 8 13 ...
Страница 16: ...DIAGRAM 9 15 ...
Страница 21: ...20 ...