12
OPERATION
CHECK THE SPRING OF THE SLIDING DEVICE
PROCEDURE
Ensure that the push up spring of the sliding device (assembled on the hammer) has
not reached its yielding point and that it pushes the device to the max. stroke.
FREQUENCY
AFTER 50 WORKING HOURS
OPERATION
CHECK THE PULL CHAIN ARM AND ITS SPRINGS.
PROCEDURE
Ensure that the pull-chain arm and its springs (located inside the compactor) are
working correctly, keeping the chain well stretched.
FREQUENCY
AFTER 50 WORKING HOURS
OPERATION
CHECK THE LEADING PLATE AND THE SLIDING DEVICE OF THE RAMMER
PROCEDURE
Verify that the leading plate and the sliding device are not worn out. If necessary
replace them.
FREQUENCY
AFTER 50 WORKING HOURS
OPERATION
CHECK THE LINK BLOCKS OF THE CHAIN
PROCEDURE
Ensure that the nylon link blocks keep the chain pushed towards the hammer. If
necessary adjust them using the fixing screws.
FREQUENCY
AFTER 50 WORKING HOURS
OPERATION
CHECK THE PROPER WORKING OF THE SAFETY DEVICE CONNECTED TO
THE LOWER SAFETY GUARD
PROCEDURE
Let the compactor work for some minutes simulating a test. Open the safety guard.
When this is opened push the button to start again the working of the compactor.
If the appliance doesn’t start any of its functions, the safety system is working
properly. If the appliance starts some of its functions stop immediately using the
machine and follow the disposal given in the chapter “DIAGNOSIS” of this user
manual.
PRECAUTIONS
During this inspection nobody, including the end user can be in the space
where the rammer is moving.
FREQUENCY
AFTER 50 WORKING HOURS
OPERATION
CHECK THE COUPLE OF SCREW NUTS THAT LOCK THE FIXING BOLTS.
PROCEDURE
The
screw
nuts
“A9”
of
the
threaded
fixing
bolts
-
used
to
fix
the
mould
supporting
table
and
the
wooden
column
at
the
concrete
basement
–
are
fix
ed
with
a
couple of
locking
10Nm
as
described
by
the
Standard.
Before
using
the
compactor,
it
is
advisable
to
check
the
screw
nuts
by
using
a
proper
wrench
in
order
to
correct
the
settlements
that
may
occur
between
the
assemblage
and
the
first
test.
FREQUENCY
Carry out this check periodically, with a frequency of about 120 days
Содержание BM255
Страница 16: ......
Страница 23: ...8 ENCLOSURE D ELECTRIC PANEL ...