  For direct driven pumps the alignment between 

pump and motor shafts must be kept within the 

following limits: 

 

Max run-out 

Max angular 

  

misalignment 

 

(mm) 

(degrees)

 Type LPD 

 and ACD 

(n/a short coupled)

 Other types  0.3 

0.1

Fig 5. 

 

 

!

  When handling liquids which may involve 

fire hazards appropriate precautions to 

avoid danger are to be taken.

!

  Measures shall be provided to avoid 

accidental contact with the rotating shaft 

coupling. Any installed coupling guard  

shall permit easy access to the pump 

shaft for maintenance and inspection of 

the  pump bearing and seal housing.

Pipe connections

The pipe work shall be installed and supported so 

that no pipe stresses are transfered to the pump 

body.
The pipe work should be tight in order to avoid 

leakage and infiltration of foreign particles and/or air.

Shut off valves should be installed in both suction 

and discharge pipes, so that the pump can be 

hydraulically isolated.

Suction line

The suction pipe should be designed so that the 

total pressure drop, measured at the pump inlet 

flange, does not exceed the suction capability of the 

pump.
Make a proper calculation of the suction line 

including components such as valves, strainer, 

pipe bends etc. Generally, the pressure drop in the 

suction line should be as low as possible, which is 

achieved if the suction pipe is short, straight and has 

a suitable diameter.
The velocity in the suction line should be kept in the 

range 0.5 - 1.2 m/s. For L.O. circulating systems, we 

recommend to keep it as low as possible.
The suction line must be equipped with a port that 

allows filling the pump before start.

Discharge line

The discharge line should be dimensioned to keep 

the velocity in the range 1 - 3 m/s.

Deaeration

In installations with negative suction head, where 

the pump might be started against a pressurized 

system, a deaeration pipe with an orifice (2-3 mm 

recom mended) has to be installed. The deaeration 

pipe should be connected to the outlet pipe’s highest 

point. 

This must also be installed when the pump is used 

as an stand-by pump.

www.northridgepumps.com

Содержание ACF5

Страница 1: ...ns may cause damage and personal injury Screw pumps ACF UCF 5 Contents Page Introduction 2 Safety 2 Pump identification 4 Installation 5 Start up 10 Trouble shooting 12 Maintenance and Service 14 List...

Страница 2: ...d Only select the setup type according to this operating manual For example the following are not allowed Hanging pumps in the pipe Overhead installation Installation in the immediate vicinity of extr...

Страница 3: ...valve in the pump Provide an appropriate safety valve on the pressure side between the pump and the first shut off device Warranty Obtain the manufacturer s approval prior to carrying out any modifica...

Страница 4: ...ounting Y Vertical foot mounting 3 E Without valve G Valve with external return P Valve with internal return for total pressure range 4 Valid for UCF Option A020 Pump with surface treated casing s A08...

Страница 5: ...ed to the front cover for pump LPQ Pump and connecting frame are lifted together using two eye bolts securely fastened to the top of the connecting frame Thread dimension is M 16 except for frame size...

Страница 6: ...t is easily accessible for inspection and servicing Provisions for collecting oil spillage when servicing the pump should be considered ATTENTION The installation must always be designed to minimise d...

Страница 7: ...that the pump can be hydraulically isolated Suction line The suction pipe should be designed so that the total pressure drop measured at the pump inlet flange does not exceed the suction capability o...

Страница 8: ...decisively influenced by the degree of contamination of the fluid being conveyed that means by the number size and hardness of the abrasive components Shaft seal drain The pump should be installed so...

Страница 9: ...ds of time without harming the pump except when pumping low viscosity media If more than 50 recirculation is anticipated a value specific to each application should be determined by closely monitoring...

Страница 10: ...eaeration plug and fill the shaft seal compartment with oil Fit and tighten the plug See fig 16 Note for LPQ the amount of oil is appr 50 liter Make sure the prime mover is locked out and can not be s...

Страница 11: ...hen the spindle is turned clockwise By monitoring the pressure gauge it can be determined when the suction line is primed and the pump begins to work Should the pump not operate normally soon after st...

Страница 12: ...ectric cables to motor wrongly connected Wrong direction of rotation Suction line is not open or pressure drop in the suction line is too high Major air leakage into the suction line The pump cannot e...

Страница 13: ...ressure relief valve Reduce the pressure setting until operational temperature has been reached Check the discharge line See above Pressure too high Readjust the pressure relief valve to a lower value...

Страница 14: ...ng screw 1 429A Tension pin 1 430 Piston 1 Valid for sizes 100 125 1 432 Tension pin Valid for sizes 100 125 1 437 O ring 1 x x x 451 Screw 4 451A Washer 4 453 Screw 8 455 Screw 4 455A Washer 4 462 Pl...

Страница 15: ...95012 901195012 901195012 IEC 280 901195013 901195013 901195013 Kit Contents To be used for G057 Gaskets o rings ball bearing etc Dismantling of the pump G053 G057 Shaft seal G050 Normal scheduled ins...

Страница 16: ...ys be present Ten drops per hour can be considered as acceptable An external visual inspection of the pump is advisable at least every two days to assure that the shaft seal is not leaking too much Ex...

Страница 17: ...02 401 556 453 480 B Sizes 080 090 C C 4240 425 429 437 424 Sizes 100 125 424A 429A 432 430 010 0 1 4 4 1 4 List of tools necessary for dismantling and reassembly A Slide calliper B Screw driver D Cro...

Страница 18: ...ing 10 Use appropriate vessels to collect oil spillage when operating the pump 11 Pump and or motor should be lifted with straps securely so that the centre of gravity is located in order to avoid tip...

Страница 19: ...n piece should fit on the opposite side of S1 and is used lager on when S1 is pressed into the end cover 520 again E Remove the key 113 F Pull the cover 520 upwards Loosen set screws that lock S5 to s...

Страница 20: ...olts 425 and pull the complete tun ing device straight upwards N Change o ring 437 on the tuning piston 429 and mount it in 4240 in reverse order L Unscrew the valve counter clockwise as far as possib...

Страница 21: ...ghtening the nut NOTE The measurement of this tool varies depending on the pump size a measurement table can be found in the tool description on page 7 The tool can also be purchased from IMO AB A Lub...

Страница 22: ...own above grease the surface thoroughly on the power ro tor as this prevents damage to the seals rubber details when mounting it Lock set screws to 8 Nm NOTE It is very important that the mechanical s...

Страница 23: ...ith a suitable tool NOTE Do NOT mount the coupling half with a hammer as this will destroy the shaft seal I Lubricate and fit the power rotor 1020 into the pump by carefully guide it into the idler ro...

Страница 24: ...24 www imo se ACF UCF5 2019 12 en GB ID No 163 044 B Adress IMO AB rsta ngsv 27C 1117 43 Stockholm Sweden Telephone 46 8 50 622 800 www northridgepumps com...

Отзывы: