background image

18

INS

TALL

AT

O

R

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

1.19 FLUES, CHIMNEYS, CHIMNEY CAPS 

AND TERMINALS.

The flues, chimneys and chimney caps for the 

evacuation of combustion products must be in 

compliance with standards in force. The chimney 

caps and the roof exhaust terminals must respect 

the outlet quotas and the distance of the foreseen 

technical volumes from the current technical 

regulations.

Positioning the wall exhaust terminals.

 The 

exhaust terminals must:
- be installed on external perimeter walls of the 

building;

- be positioned according to the minimum 

distances specified in current technical 

standards.

Combustion products exhaust of natural or 

fan assisted appliances in open-top closed 

environments.

 In spaces closed on all sides 

with open tops (ventilation pits, air shafts, 

courtyards etc.), direct flue exhaust is allowed 

for conventional or fan assisted draught gas 

appliances with a heating power range from 4 to 

35 kW, provided the conditions as per the current 

technical standards are respected.

1.20 SYSTEM FILLING.

Once the boiler is connected, proceed with 

system filling via the filling valve (Fig. 1-32 and 

2-2). Filling is performed at low speed to ensure 

release of air bubbles in the water via the boiler 

and heating system vents.

The boiler has a built-in automatic venting valve 

on the circulator. 

Check if the cap is loose.

 Open the 

radiator air vent valves.

Close radiator vent valves when only water 

escapes from them.

Close the filling valve when the boiler manometer 

indicates approx. 1.2 bar. 

N.B.:

 during these operations start/up the 

circulation pump at intervals, acting on the main 

switch positioned on the control panel. 

Vent the 

circulation pump by loosening the front cap and 

keeping the motor running.

 Re-tighten the cap 

after the operation.

1.21 FILLING THE CONDENSATE TRAP.

On first lighting of the boiler combustion 

products may come out the condensate drain; 

after a few minutes’ operation check that this no 

longer occurs. This means that the trap is filled 

with condensate to the correct level preventing 

the passage of combustion products.

1.22 GAS SYSTEM START-UP.

To start up the system, refer to the current 

regulations. This divides the systems and 

therefore the start-up operations into three 

categories: new systems, modified systems, re-

activated systems.

In particular, for new gas systems:

- open windows and doors;
- avoid presence of sparks or naked flames;
- bleed all air from pipelines;
-  check that the internal system is properly sealed 

according to specifications.

1.23 BOILER START UP (IGNITION).

For issue of the Declaration of Conformity 

provided for by Italian Law, the following must 

be performed for boiler start-up:

-  check that the internal system is properly sealed 

according to specifications;

-  ensure that the type of gas used corresponds to 

boiler settings;

-  switch the boiler on and ensure correct ignition;
- make sure that the gas flow rate and relevant 

pressure values comply with those given in the 

manual ( Par. 3.18);

- ensure that the safety device is engaged in the 

event of gas supply failure and check activation 

time;

- check activation of the main switch located 

upstream from the boiler and in the boiler;

- check that the concentric intake-exhaust 

terminal (if fitted) is not blocked.

The boiler must not be started up even if only 

one of the checks should be negative.

N.B.:

 the boiler preliminary check must be carried 

out by a qualified technician. The boiler warranty 

is valid as of the date of testing.

The test certificate and warranty is issued to the 

user.

Содержание VICTRIX X12-242I

Страница 1: ...VICTRIX X 12 24 2 I IE Instruction and Warning book 1 036643ENG...

Страница 2: ......

Страница 3: ...user also in the case of transfer or succession of ownership It must be stored with care and consulted carefully as all of the warnings provide important safety indications for installation use and m...

Страница 4: ...ation pump 19 1 25 Kits available on request 20 1 26 Boiler components 21 2 Instructions for use and maintenance 22 2 1 Cleaning and maintenance 22 2 2 General warnings 22 2 3 Control panel 22 2 4 Usi...

Страница 5: ...pliance off immediately and contact a qualified technician e g the Immergas Technical Assistance centre which has specifically trained staff and original spare parts Do not attempt to modify or repair...

Страница 6: ...by introducing a top quality anti freeze liquid into this circuit which is not noxious to health The instructions of the manufacturer of this liquid must be followed scrupulously regarding the percent...

Страница 7: ...ional way using the couplings on the boiler template The boiler safety valve outlet must be connected toadrainingfunnel Otherwise themanufacturer declines any responsibility in case of flooding if the...

Страница 8: ...i e it must be set to On Off mode CARV2 or chrono thermostat On Off electric connection Optional The operations described below must be performed after having removed the voltage from the appliance T...

Страница 9: ...l Kit This information allows calculations to be made to verify the possibility of setting up various flue configurations Positioning of the gaskets black for green range flue extraction systems Posit...

Страница 10: ...Intake and Exhaust 16 3 m 2 5 Intake m 18 7 Exhaust m 4 9 m 7 7 Exhaust m 13 6 Concentric vertical intake exhaust terminal 60 100 Intake and Exhaust 9 m 1 4 Intake m 10 3 Exhaust m 2 7 m 4 3 Exhaust...

Страница 11: ...of the straps present in the kit making sure to block the 4 gasket flaps Fit the male side smooth of the exhaust terminal into the the female side of the bend 90 80 making sure that the relevant wall...

Страница 12: ...o the external atmosphere The technical regulations in force must be respected Max length of exhaust duct The flue pipe vertical or horizontal can be extended to a max length of 30 straight metres Spa...

Страница 13: ...al intake exhaust kit 80 125 Kit assembly Fig 1 18 for the installation of kit 80 125 the flanged adapter kit must be used to be able to install the flue system 80 125 Install the flanged adapter 2 on...

Страница 14: ...l 6 and insert the intake exhaust pipe 5 Fit the 60 100 3 concentric terminal pipe with the male end 5 smooth into the flange 2 up to the stop making sure that the wall sealing plate has been fitted 3...

Страница 15: ...sent in the lateral hole with respect to the central one according to needs and replace it with the flange 3 positioning the gasket 2 already present in the boiler and tighten using the supplied self...

Страница 16: ...emoval of possible condensate forming in the exhaust pipe tilt the pipes towards the boiler with a min slope of 1 5 Assemble the lid A complete with adapter 1 and wall plugs 6 and assemble the flue to...

Страница 17: ...e inside the flue technical slot The max possible length of the 60 flexible ducting vertical section is equal to 30 m This length is obtained considering the complete 80 exhaust terminal 1m of 80 pipe...

Страница 18: ...nt the circulation pump by loosening the front cap and keeping the motor running Re tighten the cap after the operation 1 21 FILLING THE CONDENSATE TRAP On first lighting of the boiler combustion prod...

Страница 19: ...24 CIRCULATION PUMP The Victrix X 12 24 2I series boilers are supplied with a built in circulation pump with 3 position electric speed control The boiler does not operate correctly with the circulatio...

Страница 20: ...rmation of lime scale and preserves the original heat exchange and domestic hot water production conditions The boiler is prepared for application of the polyphosphate dispenser kit Relay board on req...

Страница 21: ...ondensation module 11 Flue probe 12 Heat exchanger safety thermofuse 13 Manual air vent valve 14 Sample points air A flue gases F 15 Negative signal pressure point 16 Positive signal pressure point 17...

Страница 22: ...ic hot water temperature selector switch 6 Central heating water temperature selector switch 7 Boiler manometer 8 DHW production phase functioning active 9 Boiler in block does not require release via...

Страница 23: ...ite flame block 20 Return probe anomaly 23 Push button control panel anomaly 24 Block due to flue gas temperature gradient intervention 25 Insufficient circulation 27 Flue probe anomaly 29 Loss of rem...

Страница 24: ...signal loss error occurs 6 times consecutively in 8 5 minutes 38 To eliminate the block the Reset button 3 must be pressed If this phenomenon occurs frequently contact a qualified technician for assis...

Страница 25: ...TI FREEZE PROTECTION The boiler has an anti freeze function that switches on automatically when the temperature fallsbelow 4 C standardprotectiontominimum temperature of 5 C All information relative t...

Страница 26: ...the gas flow rate regulation devices if settings are modified checktheproductionofDHW whentheboiler is connected to an external cylinder unit ensure sealing efficiency of water circuits check ventilat...

Страница 27: ...ed for software updating operations 3 3 TROUBLESHOOTING N B maintenance interventions must be carried out by a qualified technician e g Immergas After Sales Technical Assistance Service Smell of gas C...

Страница 28: ...eating output ignition power 3 6 ADJUSTMENT OF THE AIR GAS RATIO Important theverificationoperationsoftheCO2 must be carried out with the casing mounted while the gas valve calibration operations must...

Страница 29: ...heating demand of the house Therefore the boiler works normally in a variable gas pressure field between minimum and maximum power depending on the system heat load setting fan speed in rpm hundreds...

Страница 30: ...ich can be configured 0 Off 1 General alarm 2 CH phase active 3 External gas valve power supply 4 Secondary zone control from TA on relay board contact 5 Heat pump 0 5 0 P5 Relay 3 optional The boiler...

Страница 31: ...every new power supply of the boiler by pressing buttons at the same time 2 and 4 Fig 2 1 for 5 seconds with boiler in stand by N B if the boiler is connected to the CARV2 the stand by function is onl...

Страница 32: ...osen the two screws 4 present in the lower part of the casing front 3 unhook the central fixing 6 exerting slight pressure in the median zone of the side 5 pull the front casing slightly in the lower...

Страница 33: ...sure of 1013 mbar Burner pressure values refer to use of gas at 15 C Victrix X 12 2 I Victrix X 24 2 I METHANE G20 BUTANE G30 PROPANE G31 HEAT OUTPUT HEAT OUTPUT BURNER GAS FLOW RATE BURNER NOZZLES PR...

Страница 34: ...at Nom Q Min mg kWh 48 13 185 20 85 25 Flue temperature at nominal output C 56 63 57 Flue temperature at minimum output C 58 64 59 Victrix X 24 2 I Gas nozzle diameter 8205 gas valve mm 5 80 4 10 4 1...

Страница 35: ...Nom Min 106 9 102 4 106 7 103 0 Efficiency 40 30 Nom Min 107 0 106 8 108 1 107 1 Heat loss at casing with burner On Off 80 60 C 0 89 0 30 0 41 0 50 Heat loss at flue with burner On Off 80 60 C 0 02 2...

Страница 36: ...erial Number CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum heating capacity domestic Qn min Minimum heating capacity heating Qnw max Maximum heating capacity dom...

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ...mergas com Immergas S p A 42041 Brescello RE Italy T 39 0522 689011 F 39 0522 680617 This instruction booklet is made of ecological paper Cod 1 036643ENG rev ST 000346 000 02 2014 Inglese per IRLANDA...

Отзывы: