IMC IMCQS Series Скачать руководство пользователя страница 6

 

   

6   

Chapter   3   
3.1   Mechanical   Description   and   Adjustment   

   

Working   principle   and   structure:   

1.   The   automatic   bottle   rinse   machine   applies   rotary   sprinkle   inner   and   outer   washing   principle.   

2.   Machine   main   device:   washing   device,   entry   and   exit   bottle   thumb-­‐wheel   and   guide   set,   convey   device.   

The   governor   using   electromagnetic   motor,   the   power   transmission   device   will   spread   to   dial,   dial   

on   the   folder   containing   bottles   of   mechanical   hand,   mechanical   hand   with   a   rotary   dial,   the   

bottle   into   the   bottle   in   the   role   of   the   device   into   the   bottle   transferred   to   the   district,   the   

manipulator   will   be   transferred   to   the   bottle   Clamping   so   that   the   bottle   into   the   washing   area,   

while   the   role   of   the   rails   under   the   auto-­‐complete   180-­‐degree   flip,   flushing,   brown,   etc.   Washing   

processes,   and   then   reset   by   the   bottle   dial   wheel,   thus   finished   bottle   washing   process,   reach   the   

purpose   to   wash,   delivering   to   the   filling   machine   by   the   transport   chain.   

   

   

Adjustment   

Adjustment   of   wheel   set:   

Because   of   transportation,   you   must   adjust   the   machine’s   synchronization.   Loose   the   screw   bolt,   

turn   the   thumb   wheel   clockwise   or   anti-­‐clockwise   until   the   bottle-­‐block   groove   on   the   thumb   

wheel   in   the   correct   position,   then   fasten   the   bolt.   

   Adjustment   of   cleaning   parts:   

Disassemble   the   above   locking   plate;   put   the   handle   into   the   hole   and   rotary   the   round   nut   as   

clockwise.   Then   rinsing   parts   will   rise.   At   last,   fit   on   the   locking   plate.   

   

Debugging   

1.   Connect   the   lower   part   of   the   pipeline   and   the   row   of   the   pipelines.      

2.   Electrical   wiring   must   meet   the   plane   on   the   subject   of   the   direction   of   rotation;   it   prohibited   

the   wheel   reverse   operation.      

3.   Rinse   the   bottles   by   the   high   plane,   using   the   wrench   to   rotation   spindle   adjustment   place   highly   

suitable   for   the   position,   at   the   same   time,   in   front   of   the   folder   bottles   Cam   transferred   to   the   

robot   opened   moderately.      

4.   Connected   to   the   main   electrical   switch,   rotating   the   speed   control,      make   the   appropriate   

speed,   to   see   whether   the   whole   machine   is   smooth,   if   it   is      normal   operation,   you   can   put   the   

bottle   to   test   machine.      

5.   If   producing   the   different   diameter   bottle   must   be   replaced   with   the   suitable   dial   wheel   and   the   

arc   plank,   and   at   the   same   must   adjust   the   distance   between   the   two   baffles   until   match   with   the   

bottle   diameter.   

   

Operation   

1.   Preparation   before   turn   on   the   machine.   

2.   Check   if   all   the   oil-­‐inject   parts   have   been   injected.      

2.1   Turn   on   the   power   to   check   if   the   machine   operates   well.   Also   you   need   to   check   the   supplied   

and   drain   water   pipes   and   if   there   is   a   stoppage   in   rinsing   pipes.      

2.2   Stop   immediately   when   bottles   are   damaged,   and   remove   the   trouble   at   once.   

   

   

Содержание IMCQS Series

Страница 1: ...1 IMCQS Series of Automatic Washing Machinery INTERNATIONAL MACHINE CONCEPTS WELCOMES YOU TO YOUR NEW MACHINE Operation Manual Date 2015 Version 1 Serial Number...

Страница 2: ...nnections 1 4 Chapter 2 Technical Parameters and Description 2 1 Chapter 3 Operation Instruction Mechanical description and adjustments 3 1 Chapter 4 Malfunctions Faults and their rectification Table...

Страница 3: ...ly break open the exterior panels to reveal the machine and its working parts The machine will be covered in a plastic protective cover This is to be removed Make sure that no parts have been damaged...

Страница 4: ...chine should be placed on level ground After installing the machine check if the machine is level by Level Instrument If not please adjust the four legs Check every part of the machine carefully for d...

Страница 5: ...uirement 0 75Kw Bottle Diameter 50 100mm Bottle Height 160 300mm Dimensions L1200 W1100 H1800mm Capacity 2000 3000 bottle hour Productivity of 2L bottles 1000b h Bottle Damage rate 3 Washing heads 12...

Страница 6: ...the bolt Adjustment of cleaning parts Disassemble the above locking plate put the handle into the hole and rotary the round nut as clockwise Then rinsing parts will rise At last fit on the locking pla...

Страница 7: ...oosen the five screws of the thumb wheel and guide plate Remove the top guide plate Loosen the three columns in the guide plate Remove the bottom guide plate and then install in order Remove the origi...

Страница 8: ...s height 1 2 Loosen the screws adjust the height and then tight it Screw the screw on the bottom of the big gear when clockwise the filling cylinder will move down when counter clockwise the filling c...

Страница 9: ...system check drive unit for fault if in fault disconnect power from machine and wait 5 minutes and then switch on machine again If problem persists main drive unit may be damaged Replace unit Water se...

Страница 10: ...peration parts regularly Lubrication of each part 1 Lubrication of gears 2 Lubrication of bottle clamping in washing machine 3 Lubrication of gear box Check whether with lubrication oil or not every w...

Страница 11: ...loosen in some part when checking all is ok can start the machine 2 After working should clean the machine and note to add oil in moving part 3 Check the electricity box for making sure it is dry 4 G...

Страница 12: ...12 Chapter 6 6 1 Electrical Diagrams Pinboard No 1 2 3 4 5 6 7 Connect line name Phase line Mid line F1 F2 U1 V1 W1 AC220V power...

Отзывы: