13
8、Daily maintenance requirements
8.1. The equipment maintenance list and requirements are shown in the table below
project
Frequency
Requirement
Daily
Weekly
Monthly
Half
year
1
Clean up the
dust
√
Remove dust from equipment surface and
parts
2
Cleaning up
oil pollution
√
Clean the greasy dirt on the table ,
needle plate and bobbin
3
Air tube
interface
√
The air tube interface is tight without
air leakage
4
Oil
√
Oil volume not lower than warning line
5
Bobbin
√
Check if the bobbin is scratched
6
Sensor
√
Check if the sensitivity is accurate and
if the position changes
7
Slider
√
Check slide lubrication and add
lubricant if necessary
8
Electric
control box
√
Cooling fan runs normally, clean up the
dust in time