background image

Platinum™ VX 
Installation and Operation Manual 

 

Platinum VX Modules 

 

© 2016 Imagine Communications Corp.

          

Proprietary and Confidential.

 

Version 1.2 | Page 64 

 

 

Figure 49:

 

Power on a 4/8 RU Frame 

 

Power Supply Status on the Dashboard 

Status for installed (one or both) power supplies is displayed on the main dashboard in the right hand 
corner (below the IP Addresses).  

 

In case of a 4/8 RU frame, power supply status is displayed for 

LEFT 

and 

RIGHT 

supplies. This is 

based on the position they are plugged in, looking at the frame from the front. 

 

In case of a 1/2 RU frame, the power is indicated by supply - 

PS1 

and 

PS2

. This is to help identify the 

power supply plug that goes in. 

 

 

Figure 50:

 

8 RU Power Status 

Figure 51:

 

1/2 RU Power Status 

 

Содержание Platinum VX

Страница 1: ...Platinum VX Frame and Modules Version 1 2 January 2016 Installation and Operation Manual...

Страница 2: ...notice to make such changes in equipment design specifications components or documentation as progress may warrant to improve the performance of the product Trademarks Platinum Platinum IP3 Magellan C...

Страница 3: ...and Symbols in this Manual 12 References 12 Waste from Electrical and Electronic Equipment WEEE Compliance 13 Restriction on Hazardous Substances RoHS Compliance 14 Platinum VX Overview 15 Platinum V...

Страница 4: ...trol Module 42 Resource Crosspoint Module PV 144X144 3G4 or PV 288X288 3G8 43 Resource Module Redundancy 45 Adding a Second Resource Module into a Platinum VX Frame 46 Resource Video Crosspoint Settin...

Страница 5: ...ess 80 Supported Network Protocols 80 Using Magellan CCS Navigator 80 Controlling your Platinum VX via a Hardware Control Panel 81 Telnetting into a Platinum VX 88 Features 89 Dashboard Overview 89 Co...

Страница 6: ...126 Ethernet 2 Parameters 127 Serial Port Parameters 128 Clock Parameters 129 Module Configuration 131 CQS Module Configuration 131 CQS Menu 131 Reference Menu 132 Advanced Settings Menu 132 Faults 13...

Страница 7: ...mmunications Corp Proprietary and Confidential Version 1 2 Page 7 Upgrading to Version 1 2 157 Note for 8 RU Frames Upgrading from firmware version 1 0 1 158 User Foundry 159 Administrator Account 159...

Страница 8: ...s manual details the features installation operation maintenance and specifications for the Platinum VX Audience This manual is written for engineers technicians and operators responsible for installa...

Страница 9: ...e Input Parameters on page 107 and SFP Module Output Parameters on page 108 Support for new Platinum VX CQS PV CQ16 FR 1 Platinum VX CQS updates The following sections were added updated Updated Overv...

Страница 10: ...nformation for 8 RU users on firmware version 1 0 1 See Note for 8 RU Frames Upgrading from firmware version 1 0 1 on page 158 Writing Conventions This manual adheres to the following writing conventi...

Страница 11: ...t your product fails to operate properly please contact Customer Service to obtain a Return Authorization RA number and then send the unit back for servicing Keep at least one set of original packagin...

Страница 12: ...onditions or practices that may result in personal injury or loss of life High voltage is present CAUTION Statements identifying conditions or practices that can result in damage to the equipment or o...

Страница 13: ...eration ICES 003 2013 These devices do not exceed the Class A limits for radio noise emissions from digital apparatus as set out in the interference standard entitled Digital Apparatus Safety Standard...

Страница 14: ...ous Substances RoHS sets limits on the use of certain substances found in electrical and electronic equipment The intent of this legislation is to reduce the amount of hazardous chemicals that may lea...

Страница 15: ...RU 288 x 288 up to 288 x 288 The 1 RU variant of the Platinum VX offers 16 inputs and 16 outputs HD BNC with the option to use SFPs for an additional optical or electrical 16 inputs and 16 outputs A...

Страница 16: ...tion similar to the Platinum IP3 Controller software All setup configuration and database functions are accomplished through the web interface housed within each of the four frames Automation Support...

Страница 17: ...ror monitoring EDH CRC Freeze and Black monitoring Two processed SD HD 3G SDI outputs with processing bypass option for each output Audio and Video Processing Four video frame synchronizers with H Pha...

Страница 18: ...ing in a standard 19 in 48 cm rack using front mounting ears and rear support brackets occupying a vertical space of 1 75 in 1 RU 3 5 in 2 RU 7 in 4 RU or 14 in 8 RU When installing a Platinum VX in a...

Страница 19: ...Mounting for 1 2 RU Frames Although the pre installed frame mounting ears provide the main support for the Platinum VX within a rack you must install arms brackets and a cable relief bar at the rear o...

Страница 20: ...provided 4 Slide the two arms into their slots from the back of the frame and attach the arms to the back of the rack Figure 3 Installed Support Arms and Cable Tie Bar Rack Mounting for 4 8 RU Frames...

Страница 21: ...the bottom screw from the back of the frame 3 Attach the tongue shaped frame support bracket to the side of the frame by reinserting the screw removed in the previous step and adding an additional sc...

Страница 22: ...he back of the frame Network Settings When shipped the Platinum VX is configured with a default IP address subnet mask and default gateway If you intend to control the unit remotely or connect it to a...

Страница 23: ...ubnet addresses These addresses need to be changed so that each unit is uniquely identified and the network location of all units is accurately reflected The default factory configured ENET 1 IP addre...

Страница 24: ...re are 16 SFP small form factor pluggable cages on the frame providing an additional 16 inputs and 16 outputs You add the hot pluggable SFP modules to create versatile solutions that fit the specific...

Страница 25: ...me PV FR 1 and an additional Clean and Quiet Switching CQS sub board See PV CQ16 Modules CQS Modules on page 104 Table 5 1 RU PV CQ16 FR 1 Platinum VX Frame Modules and Matrix Part Number Frame Type H...

Страница 26: ...The 2 RU frame is factory fitted with 48 x 48 HD BNC connectors 72 x 72 HD BNC connectors or mixed SFP 24 x 24 and HD BNC 48 x 48 It is not user configurable If future expansion may be required consi...

Страница 27: ...tial Version 1 2 Page 27 Figure 9 2 RU Platinum VX Rear View 48x48 configuration Figure 10 2 RU Platinum VX Rear View Connectors 72x72 configuration Figure 11 2 RU Platinum VX Rear View 24x24 SFP 48x4...

Страница 28: ...on page 101 4 RU Frame PV FR 4 The Platinum VX 4 RU frame is configurable with up to 6 back modules offering a total of 144 inputs and 144 outputs Each Input Output module supports 24x24 HD BNC or SF...

Страница 29: ...iew showing 1 SFP and 5 HD BNC modules Figure 15 4 RU Platinum VX Rear View Connectors showing 1 SFP and 5 HD BNC modules For more information on PV FR 4 see 4 8 RU Frame User Interface Platinum VX Da...

Страница 30: ...4 HD BNC or SFP connectivity For each of the 12 input output modules you can choose SFP or HD BNC variants Table 8 8 RU Platinum VX Frame Modules and Matrix Part Number Frame Type No of Modules Number...

Страница 31: ...VX Installation and Operation Manual Platinum VX Frame 2016 Imagine Communications Corp Proprietary and Confidential Version 1 2 Page 31 Figure 17 Platinum VX 8 RU Rear View showing 2 SFP and 10 HD BN...

Страница 32: ...ule PV 24O IOG on page 34 PV 144X144 3G4 Platinum VX SD HD 3G 144X144 Video Crosspoint and Control Module For 4 RU See Resource Crosspoint Module PV 144X144 3G4 or PV 288X288 3G8 on page 43 PV 288X288...

Страница 33: ...utputs see HD BNC I O Module PV 24C IOG on page 33 as well as modules with SFP inputs outputs see SFP I O Module PV 24O IOG on page 34 Table 10 Input Output Modules in different Platinum VX variants F...

Страница 34: ...put Module SFP I O Module PV 24O IOG The SFP back module offers 24 inputs and 24 outputs Through the web based UI for each Input or Output module you can see status and set editable parameters See Mod...

Страница 35: ...8 RU frames You can find the extractor in the accessories box The extractor is used to remove HD BNC or SFP back modules from 4 or 8 RU frames Figure 22 Back Module Extractor Once removed from the acc...

Страница 36: ...6 To use the extractor to remove a back module 1 Loosen the screws on both sides of the module to be removed 2 Note the two guide holes at the top center of the module that the extractor needs to go i...

Страница 37: ...ons see System Fault Descriptions on page 137 CAUTION Front Fan modules are the main source of cooling for the entire system In the event of a fan failure ensure that you replace the fan as soon as po...

Страница 38: ...dule groups indicating fan status Fan Status Hardware LEDs on the Frame 4 and 8 RU frames have Hardware LEDs for fan status on the front of the frame For example in case of the 4 RU frame below there...

Страница 39: ...y and Confidential Version 1 2 Page 39 There are 16 fan LEDs on an 8RU Platinum VX Figure 26 Fan Status LEDs on 4 RU Platinum VX For 1 and 2 RU frames that have no fan specific hardware LEDs like the...

Страница 40: ...n Failures in the Faults View Servicing Replacing Fan Modules in 1 2 RU Frames 1 and 2 RU frames have four individual fans To replace a fan in a 1 or 2 RU frame 1 First unscrew the front panel and rem...

Страница 41: ...Replacing Fan Modules in 4 8 RU Frames In a 4 or 8 RU frame fans are mounted onto fan modules 4 fans to a fan module 2 fan modules in a 4 RU frame and 4 fan modules in an 8 RU frame The fan module ha...

Страница 42: ...es only the fan modules need to be removed For the 8 RU the two left fan modules have to be extracted from the system For the 4 RU only one fan module needs to be removed Fan Control Module Note This...

Страница 43: ...3G4 or PV 288X288 3G8 The Resource Crosspoint module is present in 4 and 8 RU frames This module performs both Control functions as well as Crosspoint functions The module is located in the middle of...

Страница 44: ...Platinum VX Installation and Operation Manual Platinum VX Modules 2016 Imagine Communications Corp Proprietary and Confidential Version 1 2 Page 44 Figure 33 4 RU Resource Crosspoint Module...

Страница 45: ...e is only 1 Crosspoint Resource module in 1 2 RU frames If you have 2 Crosspoint Resource Modules you can set the active one via the Select Active PVX RES Video Crosspoint parameter in the Video Cross...

Страница 46: ...rame it is inserted into whether it is inserted into Slot 1 or the Slot 2 of the frame Whether it is inserted when the frame is operational or powered down For example if a frame containing a single a...

Страница 47: ...prietary and Confidential Version 1 2 Page 47 Installing the Resource Crosspoint Module into the Frame 1 When installing the Crosspoint Module into the Frame note the notch at the bottom of the frame...

Страница 48: ...ry and Confidential Version 1 2 Page 48 3 Once you slide the module in wait until the module is positioned in the frame such that the top and bottom extractors come together easily Then slide them int...

Страница 49: ...s Corp Proprietary and Confidential Version 1 2 Page 49 2 Loosen the top and bottom extractors on the Crosspoint module by gently pulling the extractors outward 3 Once the extractors have been loosene...

Страница 50: ...the secondary crosspoint If there is only one Crosspoint in the frame only 1 LED will be lit Figure 35 Resource Crosspoint Module LEDs on a 4 RU Frame An 8 RU frame has 4 ON ACTIVE LEDs When looking...

Страница 51: ...d Resource Modules All control ports remain inactive until and only if the router has fully booted and has established communications Even in a powered down state a router connected to any communicati...

Страница 52: ...rietary and Confidential Version 1 2 Page 52 Ethernet Ports ENET 1 IP Address 1 192 168 100 250 IP Mask 1 255 255 255 0 Gateway Address 1 192 168 100 1 ENET 2 IP Address 2 192 168 101 250 IP Mask 2 25...

Страница 53: ...face To do this 1 Launch the Platinum VX UI in a web browser 2 Click the Configure System link in the top right hand corner 3 Click Manage Controller Settings 4 Set new IP Addresses in the Primary IP...

Страница 54: ...onnected Not connected Sync Ports The communications back module on the rear of 4 and 8 RU Platinum VX frames includes a sync port with looping connectors Each sync input automatically detects and loc...

Страница 55: ...59 94I 525 59 94 I 10 525 59 94I 1080I 50 7 625 50 I 1080P 50 7 625 50 I 720P 50 7 625 50 I 625 50 I 6 625 50 I 1080P 59 94 7 1080I 59 94 1080P 59 94 1080I 59 54 7 1080I 59 94 1080P 59 94 720P 59 94 7...

Страница 56: ...56 Figure 40 Mid Plane Module in an 8 RU Frame The Mid Plane Module has sockets on both sides for Crosspoint Modules and Input Output Modules that plug into it Plugs on the edge of the Crosspoint Reso...

Страница 57: ...Crosspoint After processing completes it re routes the signals back to the outputs The Mid Plane is a passive module with no active components however there are fuses on it These fuses are to prevent...

Страница 58: ...2 power supplies depending on whether you choose to use them both or if you turn on power for one or both redundancy can be enabled or disabled via the Redundant Power Supplies parameter See Power Sup...

Страница 59: ...RIGHT Figure 42 Power Supply Connectors on the Rear of a 4 RU frame The access panel on the front of the 4 8 RU frame can be easily opened by pressing down on the lever on the top and then pulling th...

Страница 60: ...6 at any net power level greater than 25 of rated output Power Factor 0 95 at output power 50 load 250 VAC input 0 95 at output power 30 load 90 VAC input 0 97 at 90 to 135 VAC and 0 95 at 180 to 250...

Страница 61: ...these 8 pins are shorted together GND Ground D2 D3 D4 E1 E2 E3 E4 F1 Power Blade these 8 pins are shorted together 12V Power Rail 12V F2 F3 F4 G1 G2 G3 G4 H1 Power Blade these 8 pins are shorted toget...

Страница 62: ...e frame for each of the power supplies One or both may be plugged in Figure 45 Power Supply Connectors on the Rear of a 2 RU frame When connecting the power supply cable into the outlet on the frame e...

Страница 63: ...ent 120A 230VAC Efficiency 89 Power Factor PF 0 95 230 VAC PF 0 98 115 VAC at full load 160 Watt Power Supply Pinouts Pin Number Output 1 2 4 3 1 4 12 V 2 3 12 V Power Supply Status on the Frame 1 2 R...

Страница 64: ...r supplies is displayed on the main dashboard in the right hand corner below the IP Addresses In case of a 4 8 RU frame power supply status is displayed for LEFT and RIGHT supplies This is based on th...

Страница 65: ...m VX Installation and Operation Manual Platinum VX Modules 2016 Imagine Communications Corp Proprietary and Confidential Version 1 2 Page 65 Power Supply Parameters See Power Supplies Parameters on pa...

Страница 66: ...1 Frame Contents Frame Specific Details on page 95 Main module in the frame PV 32x32 Modules see PV 32x32 Modules 1 RU and 1 RU CQS frames on page 102 CQS module in the frame CQS Modules see PV CQ16 M...

Страница 67: ...they are selected on the panel Once the desired source has been located pressing take on the control panel initiates the predetermined transition from the source selected as the current output on the...

Страница 68: ...If SFP relay bypass modules are detected on input side SFP output slots 27 28 and 31 32 are disabled The expected behavior for the SFP relay bypass module is as follows Power Loss Setup The user provi...

Страница 69: ...on 1 2 Page 69 PV CQ16 FR1 Genlock Specifications Reference Standard Video Standard Reference Standard Video Standard 525 59 94I 525 59 94 I 625 50 I 1080I 50 1080I 59 54 1080P 50 1080P 59 94 720P 50...

Страница 70: ...U Dimensions Width 17 5 in 44 5 cm 17 5 in 44 5 cm 17 5 in 44 5 cm 17 5 in 44 5 cm Depth 10 75 in 10 75 in 18 5 in 46 7cm 18 5 in 46 7cm Height 1 75 in 3 5 in 7 in 14 in Weight approx fully loaded 2 5...

Страница 71: ...Ohms HD BNC Return Loss 15dB up to 1 485GHz 10dB 1 485GHz to 2 97GHz Amplitude 800mV 10 1600mV 10 Overshoot 10 DC Offset 0V 0 5V Rise Time 400 700pS 270Mb s 135pS 1 485Gb s 100pS 2 97Gb s Fall Time 40...

Страница 72: ...TX NR Dual Electrical Transmitter see SFP 2ETX NR Dual Electrical Transmitter Specifications on page 74 SFP Series Dual channel HD BNC outputs of SD HD 3G Non reclocked output Analog Converters SFP 2E...

Страница 73: ...G pathological Power Monitoring Accuracy 3 dB Maximum Back Reflection 27 dB Optical Return Loss 29 dB Maximum Input Power 3 dBm 1310 nm Power Consumption Typical 680 mW OP SFP 2OTX 13 NR Dual Optical...

Страница 74: ...2M 1 485 1 485 1 001 Gb s SD SMPTE 259M C 270Mb s 525 625 component video ASI DVB ASI 270Mb s Impedance 75 ohms Return Loss 3G 15 dB from 5 MHz to 1485 MHz 10 dB from 1485 MHz to 2970 MHz HD 15 dB fro...

Страница 75: ...0 mW Analog Converters SFP 2E DEC Dual Electrical Receiver Specifications The SFP 2E DEC is a dual electrical SFP receiver designed to decode two video composite CVBS signals over 75 ohm coaxial cable...

Страница 76: ...Specifications Item Specification Connector Type HD BNC Standards NTSC PAL M PAL B G H I D PAL N Impedance 75 ohms Return Loss 30 dB typical from 0 1 MHz to 6 MHz Output level 0 1 0 V pk to pk 300 mV...

Страница 77: ...urrent 5V Min 55 mA Output Voltage 5V Typical 5 05V 4 8 to 5 3 V Power Consumption Typical 1030 mW SFP HDMI IN Specifications The SFP HDMI IN is an electrical receiver module designed to convert HDMI...

Страница 78: ...Power Consumption Table 28 Platinum VX Power Consumption 1 RU 1 RU CQS 2 RU 4 RU 8 RU 16 x 16 1 RU only 36W N A N A N A N A 48 x 48 2 RU only N A N A 50W N A N A 72 x 72 2 RU only N A N A 70W N A N A...

Страница 79: ...Figure 54 System LEDs on 1 2 RU Frames Figure 55 System LEDs on 4 8 RU frames Table 29 System LEDs LED Applicable Frames Color Description Alarm Level ON Active LED 4 8 RU Green Crosspoint is powered...

Страница 80: ...er must meet the minimum requirements specified for support of Microsoft Silverlight 5 0 or higher Note Ensure the appropriate Silverlight version is used based on the Operating System running on the...

Страница 81: ...a legacy control panel you need to set it up such that there is an Edge in between your control panel and your Platinum VX The EDGE is a 1 RU router protocol translator from Imagine Communications th...

Страница 82: ...al Version 1 2 Page 82 5 In Navigator create a Routing System by polling using the Platinum VX IP Address Once complete your routing system will show the EDGE and the legacy control panel physically c...

Страница 83: ...ned using Magellan CCS Navigator When used with a Magellan Router Control Panel RCP the Platinum VX supports enhanced salvos When used with other legacy control panels only basic normal salvos are sup...

Страница 84: ...Salvo content since the Platinum VX by itself does not interpret salvos You must publish via Navigator where Salvos have been defined Create a Salvo by doing the following 1 Create your Routing syste...

Страница 85: ...gine Communications Corp Proprietary and Confidential Version 1 2 Page 85 3 Click New enter a Name for the Salvo 4 Select Enhanced Salvo if desired Select one of No Force Unlock Force Unlock current u...

Страница 86: ...latinum VX Installation and Operation Manual Platinum VX Client Overview 2016 Imagine Communications Corp Proprietary and Confidential Version 1 2 Page 86 6 Click Publish to Devices for Magellan panel...

Страница 87: ...peration Manual Platinum VX Client Overview 2016 Imagine Communications Corp Proprietary and Confidential Version 1 2 Page 87 7 On legacy control panels map the basic salvos onto buttons and download...

Страница 88: ...rough protocol and not XY terminal commands You will see system heartbeats on connection t H ID You can get X Y status query device status crosspoint status etc For example I T Response from all the X...

Страница 89: ...age 141 Upgrades for Resource Modules Firmware Foundry on page 155 Access Rights User Foundry on page 159 Faults View Faults View on page 135 Fault Log Fault Log on page 136 Dashboard Overview The Pla...

Страница 90: ...Platinum VX Installation and Operation Manual Platinum VX Client Overview 2016 Imagine Communications Corp Proprietary and Confidential Version 1 2 Page 90...

Страница 91: ...VX frame displays a dashboard with details on the Frame Name Type IP Address Status Faults Power Supply Status Chassis Fan Status and so on There are also links to Configure the System See Configurat...

Страница 92: ...figure the system and perform functions related to Firmware Management and User Accounts See Configuration Dashboard see System Configuration on page 138 5 Help Link to the User Manual 6 Alarms Active...

Страница 93: ...l the mouse over a list parameter the button highlights and when you click the arrow available options are displayed Select an item in the list to set the value for this parameter Figure 60 Example of...

Страница 94: ...ts Input Output categories on the left Instances in the middle for example 12 outputs for the SFP module Parameter fields to the right You can drag the divider between these panes to expand and contra...

Страница 95: ...Frame Specific Details When you click the Go to Frame button on the main dashboard the contents of the frame are displayed 4 8 RU Frames In case of 4 and 8 RU frames individual modules are displayed...

Страница 96: ...ain board See PV 32x32 Modules 1 RU and 1 RU CQS frames on page 102 and IO 72x72 IO 48x48 2 RU Frames on page 99 Figure 63 2 RU Frame Dashboard 1 RU Clean and Quiet Frame PV CQ16 FR 1 1 RU Clean and Q...

Страница 97: ...e on page 97 Module Faults Frame Specific Parameters on page 121 Frame Faults Power Supply and Chassis Fan Status Modules Components in the Frame Module specific details are displayed in the main area...

Страница 98: ...details are displayed Figure 65 Module Details 1 Modules List The first column displays the name of the selected module and the slot it is in and lists other modules of the same type in the frame if p...

Страница 99: ...ge 105 and Output see BNC Module Output Parameters on page 106 SFP Input Output Modules 4 8 RU Frames SFP Module details are displayed when you click the Open Module button against an SFP Module in th...

Страница 100: ...ese are displayed to the right categorized under Input and Output menus INPUTS Under Inputs the Input Port Type column displays information for BNC in input slots 1 48 or 1 72 For BNC parameters see B...

Страница 101: ...on on the main dashboard Parameters for inputs outputs are displayed to the right categorized under Input and Output menus INPUTS Under Input the Input Port Type column displays information for SFPs i...

Страница 102: ...s 1 24 Note For SFP parameters displayed depending on the type of SFP inserted see SFP Module Output Parameters on page 108 Also see Supported SFP Specifications on page 71 BNC in output slots 25 72 N...

Страница 103: ...ames offer up to 32 inputs and outputs and parameters for these are displayed to the right categorized under Input and Output menus INPUTS Under Input the Input Port Type column displays information f...

Страница 104: ...page 105 SFPs if plugged in in output slots 17 32 SFP Parameters are displayed depending on the type of SFP inserted See Supported SFP Specifications on page 71 PV CQ16 Modules CQS Modules PV CQ16 is...

Страница 105: ...31 BNC Module Input Parameters Name Description Type Options Input Port Type Reports the type of port RO BNC EQ Bypass Sets the EQ mode RW On Off Default Signal Input Range In normal operation input E...

Страница 106: ...le 32 BNC Module Output Parameters Name Description Type Options Output Port Type Reports the type of port RO BNC Output Reclocker Mode Sets the reclock mode to automatic or bypass or to one of three...

Страница 107: ...Input Port Type SFP Description RO Dual Composite RX Input SFP Temperature Displays the internal temperature for the SFP RO Range 198 to 262 F 128 to 128 C Signal Status Reports input signal status Re...

Страница 108: ...HDMI IN Input Port Type SFP Description RO HDMI RX Input SFP Temperature Displays the internal temperature for the SFP RO Range 198 to 262 F 128 to 128 C Valid TDMS DE Reports the presence status of i...

Страница 109: ...atic or bypass or to one of three manual fixed rates RW Auto SD HD 3G Bypass Output Data Rate Reports the signal rate detected RO Unknown SD HD 3G No Signal Switch Point RW Switch Point 1 Switch Point...

Страница 110: ...n Type Options Output SFP ID Reports the type of SFP RO SFP 2ERX NR Output Port Type SFP Description RO SFP 2ERX NR Output SFP Temperature Displays the internal temperature for the SFP RO Range 198 to...

Страница 111: ...reclock mode to automatic or bypass or to one of three manual fixed rates RW Auto SD HD 3G Bypass Output Data Rate Reports the signal rate detected RO Unknown SD HD 3G No Signal Switch Point RW Switc...

Страница 112: ...Description Type Options DDC Control Status Reports whether there is an error in the DDC communication RO No Error Bad Receiver BKSV Ri Mismatch Pj Mismatch I2C Error usually a no ack Timed Out Waitin...

Страница 113: ...on page 115 CQS 1 See CQS 1 2 Advanced on page 115 CQS 1 A B See CQS 1 2 A B Advanced on page 116 Video See Video on page 117 o EDH CRC SQM Audio See Audio on page 118 o DMB Status o Audio Gain o Aud...

Страница 114: ...ffect for the designated CQ switch RW Cut default V Fade Cut Fade Fade Cut X Fade Take Policy Select how the switch responds when a transition that is in progress is interrupted by yet another trigger...

Страница 115: ...d Preview is applied on the output of the switch Any setting changes are applied to input signals before a switch and may or may not affect the current outputs program or preview If an input is the cu...

Страница 116: ...000 us to 63 481 us SD 525 0 000 us to 63 926 us SD 625 0 000 us to 22 231 us 720p 59 94 0 000 us to 26 653 us 720p 50 0 000 us to 29 646 us 1080i 59 94 0 000 us to 35 542 us 1080i 50 0 000 us to 14 8...

Страница 117: ...d on channel RO Yes No CQS 1 2 A B Freeze Detected Frozen frames detected on channel RO Yes No Table 48 EDH CRC SQM Parameters Name Description Type Options CQS 1 2 A B Input Y CRC Status Displays Y C...

Страница 118: ...DBN Error Reports if a data block number error has occurred in the group 1 4 RO Yes No CQS 1 2 A B Group 1 4 Parity Error Reports if a parity error has occurred in the group 1 4 RO Yes No CQS 1 2 A B...

Страница 119: ...2 A B Ch Copy Swap Channels 1A 1B 2A 2B 3A 3B 4A 4B 5A 5B 6A 6B 7A 7B 8A 8B Use this control to copy or swap the designated output embedded audio pair No Swap Swap Left to Right Right to Left Audio M...

Страница 120: ...o 4000 ms Transition Rate Medium ms RW 0 to 4000 ms Transition Rate Slow ms RW 0 to 4000 ms Board Temperature Temperature Zone 1 degrees C Temperature of Zone 1 When higher than 86 C the submodule shu...

Страница 121: ...sion RO Version CQS Hardware Version Hardware Version of CQS module RO Version CQS FPGA Version Date of main FPGA Revision RO Date CQS Firmware Revision Version of CQS firmware RO Version CQS 2nd CPU...

Страница 122: ...nterface to the Platinum VX frame These parameters are divided into different menu groups Frame Parameters on page 122 Video Crosspoint and Control Parameters on page 123 Redundancy Parameters Switch...

Страница 123: ...The Video Crosspoint and Control Card section provides the following parameters Table 54 Video Crosspoint and Control Card Parameters Parameter Type Description Options PVX RES 1 Serial RO String Not...

Страница 124: ...the firmware version on the alternate bank of the active PVX RES Figure 70 PVX RES Video Crosspoint Parameters Switch Point Parameters The Switch Point section provides the following parameters for S...

Страница 125: ...25 50 1280x720 50P 1280x720 59 94P 1920x1080 59 94I 1920x1080 50I 1920x1080 59 94P 1920x1080 5OP Figure 71 Switch Point Parameters Power Supplies Parameters The Power Supplies section provides the fol...

Страница 126: ...arameters Table 57 Ethernet 1 Parameters Parameter Type Description Options MAC Address 1 RO MAC Address of the 1st Ethernet Port on the Resource Module If using redundant Resource modules in a 4 8 RU...

Страница 127: ...pe Description Options MAC Address 2 RO MAC Address of the 1st Ethernet Port on the Resource Module If using redundant Resource modules in a 4 8 RU frame Port 2 if the Resource module on the top slot...

Страница 128: ...4 Ethernet 2 Parameters Serial Port Parameters The Serial Port section provides the following parameters Table 59 Serial Port Parameters Parameter Type Description Options Port Mode RW RS 232 RS 422 P...

Страница 129: ...al Port Parameters Clock Parameters The Clock section provides the following parameters Table 60 Clock Parameters Parameter Type Description Options UTC Date YYYY MM DD RW Set the UTC Date in YYYY MM...

Страница 130: ...oprietary and Confidential Version 1 2 Page 130 Note that the Set UTC Date Set UTC time and Set Clock Now parameters will be visible if the Platinum VX frame is in Standalone mode When in System Mode...

Страница 131: ...d to the Program output and the Preview output will remain the same Transition Rate Select the transition duration Set to Fast Medium or Slow Time used for fast medium and slow is configurable from 0...

Страница 132: ...nc Mode Set to Frame Sync or Line Sync Note The Reference Standard parameter displays the reference signal detected by the CQS module For more details see Reference Parameters on page 114 Advanced Set...

Страница 133: ...Module 3 Click the Faults button to open the module specific Faults tab Module faults are displayed with the following details Figure 77 Module Faults ID The Fault ID Fault Name The Fault Name for ex...

Страница 134: ...ule Fault Properties Click on any of the faults to have editable details displayed to the right You can choose to enable disable the fault change priority trigger value clear value and acknowledge Fig...

Страница 135: ...ouping by Device creates groups per frame listing all faults The header of the group indicates the frame name and the total number of major minor faults Figure 79 Faults Grouped by Device Individual i...

Страница 136: ...odule s Faults view and enable the fault from there Fault Log The Fault Log is accessible in the main Navigation dashboard by clicking the Fault Log button The log contains data on faults and events C...

Страница 137: ...header for example if you click the Fault Event Name header similar faults are grouped together Or you can sort by Time Issued You can Refresh Clear or Export the log contents Figure 80 Fault Log Con...

Страница 138: ...top to start configuring your Platinum VX system The Configuration Dashboard is then displayed You can do the following Database Foundry on page 141 Work with Sources and Destinations in the Database...

Страница 139: ...the System Configuration dashboard The following settings can be defined here Mode The operation mode Click Set to change Options are Standalone or System Ensure Standalone is selected for the first r...

Страница 140: ...m the system prompts you to refresh the browser and you see the following screen indicating that the system is in System mode and cannot be accessed via the Platinum VX web interface It will be access...

Страница 141: ...m System mode to Standalone mode If an Operator logs in the button Set to switch modes is grayed out Database Foundry The Firmware Foundry is accessible via the System Configuration dashboard The Data...

Страница 142: ...ion 1 2 Page 142 Note that the Platinum VX does not currently support a multi level configuration Database Editor Click the Database Editor button in the Database Foundry view to access the Database E...

Страница 143: ...s including Add Insert Update Undo Redo Remove Save Validate Publish Resync Import Export Set Preferences Add Click the Add button to add a new source or destination Number The number of Sources or De...

Страница 144: ...o Starting Location Frame The Frame that the Source Destination is in Location Type Whether Input IN or Output OUT Slot The Slot in the Frame that the Source is in Port The Port for the Slot Ports 1 t...

Страница 145: ...n 1 2 Page 145 Note For inserted sources destinations indices will not be maintained in a sequential order Figure 83 Database Editor Insert option Update Use the Update option to modify details for a...

Страница 146: ...a disconnect source or destination use the Add on page 143 function to add the source or destination uncheck the Use Name Index checkbox and enter a descriptive name in the Name Prefix field so you c...

Страница 147: ...he existing Navigator routing database contains salvos based on the old XY indices doing a resync on Platinum VX database and then importing to Navigator DBEditor will result in a loss of Salvo crossp...

Страница 148: ...and then extract the files To import a database 1 In the target Platinum VX router s Database Editor click the More button and select Import 2 Select a valid pvx file that was created by exporting th...

Страница 149: ...Installation and Operation Manual System Configuration 2016 Imagine Communications Corp Proprietary and Confidential Version 1 2 Page 149 Video Device Type Use the Video Device Type to do a single sw...

Страница 150: ...ration 2016 Imagine Communications Corp Proprietary and Confidential Version 1 2 Page 150 SD HD Video Device Type Use the SD HD Video Device Type to route 2 Crosspoints together QL Video Device Type U...

Страница 151: ...ations You can define as many source restrict sets as required The database must be defined before any source restrict definitions because Source Restricts apply to the existing logical database The e...

Страница 152: ...e same source destination can be used in multiple restriction sets Creating a new Restrict Set 1 Click the New Restrict button The New Restrict Set dialog is displayed 2 In the Destinations tab define...

Страница 153: ...ces that you want to restrict from being routed to each destination defined in the previous step by selecting from the available logical sources in the database and clicking Add 4 Optionally name the...

Страница 154: ...u may have a category called CAM and within that you have four cameras with index labels 1 2 3 and 4 In order to select the destination or source on a control panel you would first click CAM and the o...

Страница 155: ...Category and Index Click the New Category button and give the Category a name then click the New Index button and enter an index Click Save when done and then click the Publish button to publish chang...

Страница 156: ...unications Corp Proprietary and Confidential Version 1 2 Page 156 2 Browse and select the firmware package Click Open 3 You will get a message confirming the upgrade 4 Upload and Upgrade progress will...

Страница 157: ...via the PVX RES Resource Module firmware that is applied to the frame Upgrading to Version 1 2 Follow these steps provided You re using a 1 2 4 RU frame running any firmware version OR An 8 RU frame c...

Страница 158: ...o the Firmware Foundry Click the Upgrade button 2 Browse and select the PVX RES 1 0 3 firmware package Click Open 3 A message will be displayed confirming the upgrade and upgrade progress will be disp...

Страница 159: ...onfiguration dashboard and is used to manage user accounts and passwords The Platinum VX application ships with two access accounts Administrator Account This account has full access rights Some of th...

Страница 160: ...ual System Configuration 2016 Imagine Communications Corp Proprietary and Confidential Version 1 2 Page 160 Changing the Administrator Operator Password To change either of the passwords click the Cha...

Отзывы: