background image

Nexio® NX1011 Series 

 

Chapter 4 

Hardware Guide 

 

Maintaining the System

 

 

© 2014 Imagine Communications Corp.

          

Proprietary and Confidential.

 

September 2014 | Page 20 

 

Opening Nexio Monitor 

1.

 

Right-click on the Monitor icon in the system tray of your server and click 

Open

.  

 

2.

 

Use the checkboxes in the 

Monitored Parameters

 group to select the diagnostics you want to 

monitor. 

3.

 

View diagnostics status in the

 Status

 group.  

Icon 

Description 

 

Indicates a critical problem with 
the fan. 

 

Indicates a critical problem with 
the CPU temperature. 

 

Indicates a critical problem with 
the LLM 

 

Indicates no errors. 

 

Indicates an error.  

 

 

Reading Ethernet Port Indicators 

Each adapter has ACT and LINK LED indicators. The ACT LED provides connection speed information. The 
LINK LED provides link information.  

 

Gigabit Ethernet adapter with 4 ports

 

Содержание Nexio NX1011 FCP

Страница 1: ...Nexio NX1011 Series November 2014 Hardware Guide...

Страница 2: ...ption accuracy or guarantee the use for the product to which it refers Imagine Communications reserves the right without notice to make such changes in equipment design specifications components or do...

Страница 3: ...Topologies 10 NX1011 MGX 10 NX1011 MIOH 11 NX1011 FCP 11 NX1011PTCD 13 Chapter 2 Rack Mounting the Chassis 14 Choosing a Rack Location 14 Installing the Server into the Rack 14 Removing the Server fr...

Страница 4: ...r 20 Reading Ethernet Port Indicators 20 Reading Fibre Channel Card Indicators 21 Maintaining Power Supplies 21 Changing Power Supplies 22 Chapter 5 Safety Information 23 Terms and Symbols 23 RoHS Dir...

Страница 5: ...table lists different product models configurations and spares Model Configuration NX1011MGX GE Nexio Media Gateway 1011 1 RU chassis Dual 8 Gbps Fibre Channel interface connection to NXS3100 or Farad...

Страница 6: ...egrates Apple s Final Cut Pro non linear editing software with the Nexio system Quad Gigabit Ethernet ports Software plug ins to be installed on the Apple FCP workstation NX1011 FCP 10GE Nexio FCP Int...

Страница 7: ...n Description UID Unit Identification UID button When you press this button the Universal Identification LED on the front panel and the U LED on the back panel both light up Reset To reboot the system...

Страница 8: ...NIC2 Flashing indicates network activity on LAN2 NIC1 Flashing indicates network activity on LAN1 HDD Indicates channel activity Flashing indicates SSD boot drive activity Power Indicates power is be...

Страница 9: ...t ports depending on your configuration U LED LED lights up when you press the UID button Fibre Channel 2 fibre channel ports Fiber optical cable is used to connect the frame to shared storage Port 1...

Страница 10: ...unications Corp Proprietary and Confidential September 2014 Page 10 Topologies NX1011 MGX This topology integrates four NX1011 MGXs two fibre channel switches two Ethernet switches SAN storage and up...

Страница 11: ...hed via Ethernet This system design allows Nexio to scale to very large channel counts without being vulnerable to single points of failure in the connective layer The drawing shows four NX1011 MIOHs...

Страница 12: ...umber of Macintosh Clients DV25 Up to 7 clients DV50 Up to 7 clients IMX 30 40 50 Up to 7 clients XDCAM HD 35 Up to 7 clients XDCAM EX Up to 7 clients XD CAM HD422 Up to 7 clients DVCPROHD Up to 4 cli...

Страница 13: ...ibre channel adapter or via Ethernet through an NX1011MIOH Media Host The NX1011PTCD performs a real time transcode and writes those proxy files to the low resolution browse server The proxy files gen...

Страница 14: ...the floor so that it cannot tip over when the device is extended out of the rack Allow at least 25 inches of clearance in front of the rack so you can open the front panel and access the drive unit Le...

Страница 15: ...3 Attach the rail to the rack posts 4 Slide the NX1011 into the rail 5 Attach the cables to the back panel of the device Removing the Server from the Rack 1 Disconnect all cables and power cords 2 Sta...

Страница 16: ...n files onto the root of a USB flash drive This gives you a baseline image to use in the future for backup and recovery 3 Plug the USB flash drive into your device Browse to the latest Nexio Software...

Страница 17: ...r displays 2 Click Register The Windows Save As dialog displays 3 Enter a filename choose a location and click Save A pop up will quickly indicate that the software has generated a dc deployment code...

Страница 18: ...the Registration Manager and click the Load RC button to load the rc file 2 Follow the screen prompts to finish registering your server software Accessing Nexio Config You must download and register...

Страница 19: ...image for backup and recovery A blank USB flash drive is included in the server s shipping container that can be used for this purpose For complete instructions refer to the Nexio Backup Recovery Sys...

Страница 20: ...ters group to select the diagnostics you want to monitor 3 View diagnostics status in the Status group Icon Description Indicates a critical problem with the fan Indicates a critical problem with the...

Страница 21: ...0 Mbps ACT LED Orange 1000 Mbps Reading Fibre Channel Card Indicators The LINK LED indicators show link connection information If the LINK LED is lit the storage adapter is online The Connection LEDs...

Страница 22: ...Supplies If a power supply fails the LED indicator on the failed unit will be dark Note You must replace a failed power supply unit with another compatible unit of the same model 1 Unplug the power co...

Страница 23: ...of electric shock to persons CAUTION Identifies conditions or practices that can result in damage to the equipment or other property Important operating and maintenance servicing instructions are incl...

Страница 24: ...ssociated hazardous waste to either the producers or users of these products Producers or users are required to recycle electrical and electronic equipment at end of its useful life and must not dispo...

Страница 25: ...efore you disconnect the power supply Use only one hand when you are working with powered on electrical equipment Using two hands could cause electrical shock Use rubber mats specifically designed as...

Страница 26: ...end your knees when lifting the system Avoid wearing loose clothing to prevent it from coming into contact with power circuits After removing the components or chassis covers from the system place the...

Отзывы: