background image

Pg. 10

TB-PMP

7. Battery Charger 

 

         Charge only MILWAUKEE M18™ Li-Ion batteries in this MILWAUKEE Li-Ion charger. 

Other types of batteries may cause personal injury and damage. 

WHEN TO CHARGE THE BATTERY PACK WITH THIS MILWAUKEE CHARGER

Remove the battery pack from the tool for charging when convenient for you and your job.         

MILWAUKEE batteries do not develop a memory when charged after only a partial discharge. It is 

not necessary to run down the battery pack before placing it on the charger.

• 

Use the Fuel Gauge to determine when to charge your MILWAUKEE Li-Ion battery pack. 

• 

You can Top-Off your battery pack‘s charge before starting a big job or long day of use.

• 

The only time it is necessary to charge the MILWAUKEE Li-Ion battery pack is when the battery 

pack has reached the end of its charge. To signal the end of charge, power to the tool will 

drop quickly, allowing  just enough power to finish a pump cycle. Charge the battery pack as 

needed. 

HOW TO CHARGE THE BATTERY PACK

Align the battery pack with the bay and slide the battery pack into the charger as far as possible. 

The red light will come on, either flashing quickly (battery pack is too hot or cold), flashing slowly 

(battery pack is waiting for another pack to finish charging) or continuous (pack is charging). 

• 

A fully discharged battery pack with an internal temperature in the normal range will charge 

in about 30 to 185 minutes, depending on the battery pack. 

• 

Heavily cycled batteries may take longer to charge completely.

• 

The Fuel Gauge lights on 18V battery packs are displayed as the pack is being charged,  

 

indicating the charge level. The fuel gauge will turn off when charging is complete. 

• 

After charging is complete, the green light will stay on continually. 

• 

The charger will keep the battery pack fully charged if it is left on the charger. The light  

indicator will flash green during this maintenance charging. 

• 

The second battery pack inserted in the charger will begin charging when the first battery 

pack is fully charged.

• 

If the light indicator flashes red and green, verify that the battery pack is fully seated into the 

bay. Remove the battery pack and reinsert. If the light continues to flash red and green,  

remove pack(s) and unplug charger for at least 2 minutes. After 2 minutes, plug charger back 

in and insert pack. If the problem persists, contact a MILWAUKEE service facility. 

• 

If the light indicator does not come on, verify that the battery pack is fully seated into the bay. 

Remove the battery pack and reinsert. If the light indicator still does not come on, remove 

pack(s) and unplug charger for at least 2 minutes. After 2 minutes, plug charger back in and 

insert pack. If after these attempts the light indicator still does not come on, contact a  

MILWAUKEE service facility. 

Содержание TaskMaster TB-PMP

Страница 1: ...P Read and understand all of the instructions and safety information in this manual before operating or servicing this tool TaskMaster from ILSCO 4730 Madison Road Cincinnati OH 45227 www ilsco com Ph...

Страница 2: ...Parts Breakdown Page 20 13 Parts List Page 21 14 Software Installation Page 22 THANK YOU for buying an ILSCO TaskMaster Tool Our mission is to bring product innovation and exceptional customer service...

Страница 3: ...needs ILSCO tool owners will be offered options to solve any tool replacement parts or repair issues Call 513 533 6200 or 800 776 9775 Monday to Friday 8 00AM to 5 00PM Eastern Time ET MILWAUKEE BATT...

Страница 4: ...pment Always wear eye protection Protective equipment such as a dust mask non skid safety shoes hard hat or hearing protection for appropriate conditions will reduce personal injuries Do not overreach...

Страница 5: ...risk of injury and fire When battery pack is not in use keep it away from other metal objects like paper clips coins keys nails screws or other small metal objects that can short circuit from one ter...

Страница 6: ...icator lights Return adjustment knob Shoulder strap connector Label Remote pump cord Remote connection Hydraulic connection 3 Pump Parts Identification Battery compartment Oil cap USB interface Air Fi...

Страница 7: ...B PMP 4 Kit Includes 1 Battery Powered Pump 2 Milwaukee 5 0 Ah Batteries 1 Milwaukee 120V Charger 1 Shoulder Strap 1 Bag 1 Remote Pump Cord 1 Non Conductive Hose 1 USB Cable 1 Male Adapter 1 Female Ad...

Страница 8: ...apacity 5 0 Ah Type of battery Lithium ion Charging time 60 min approx Hydraulic oil Shell Tellus S2 V 15 Oil capacity 25 oz 45 1 in3 Operating temperature range 14 F to 104 F Dimensions 11 6 in x 8 1...

Страница 9: ...harging is complete Fast flashing red Battery is too hot cold Charging will begin when battery reaches correct charging temperature Slow flashing red Battery charge is pending Charging will begin when...

Страница 10: ...ully discharged battery pack with an internal temperature in the normal range will charge in about 30 to 185 minutes depending on the battery pack Heavily cycled batteries may take longer to charge co...

Страница 11: ...able parts MOUNTING TO THE WALL Use the wall mount guides to mark the hanging points To reduce the risk of injury always unplug the charger and remove the battery from the charger before performing an...

Страница 12: ...r 2 3 seconds and the tool will not run Charge the battery pack NOTE Immediately after using the battery pack the Fuel Gauge may display a lower charge level Recheck a few minutes later for a more acc...

Страница 13: ...ing marking and documentation requirements for shipping Li Ion batteries is dependent upon whether the particular batteries is dependent upon whether the particular batteries are rated greater than or...

Страница 14: ...Pg 14 TB PMP 9 Pump Setup 1 Attach shoulder strap by rotating connecting clip and pulling down until it locks in place 2 Remove cover from remote port and attach remote cord...

Страница 15: ...Pg 15 TB PMP 3 Remove hydraulic fitting cap on pump and attach hydraulic hose to pump 4 Attach hydraulic hose to head...

Страница 16: ...t battery into opening at rear of pump by squeezing battery side buttons and pushing battery in Battery will click into place 2 To remove battery squeeze side buttons and pull battery out TURNING THE...

Страница 17: ...art up and flashes slowly ON GREEN LED comes on when work cycle is complete RED LED comes on when work cycle is not complete RED GREEN LED flashes when service is due UNDERSTANDING PUMP DISPLAY Operat...

Страница 18: ...ete your cycle and retract to set position If the dial is set to 0 the pump will stop once the cycle is complete and will require manual retraction using the remote control unit The service light LED...

Страница 19: ...ting head jaws free of metal shavings Wipe down all steel parts with WD 40 Do not store the tool in a humid environment The tool should provide many years of service when given the proper maintenance...

Страница 20: ...Pg 20 TB PMP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 3 3 3 5 5 5 2 2 2 14 7 7 7 7 12 Tool Parts Breakdown...

Страница 21: ...crew 5 8 711265 Filter 1 9 714644 Shell Back 1 10 714647 Air Discharge Aperture 1 11 711262 Mandrel Short 1 12 715292 Pressure Release Lever 1 13 711401 Bolt 1 14 711263 Mandrel Long 3 15 711270 Grab...

Страница 22: ...ows XP Windows Vista Windows 7 CPU Pentium 4 at least 1 7 GHz Memory 512MB or more 1 GB or more recommended Hard Drive 200 MB 1 GB recommended Screen resolution 1024 x 768 or higher at least 65 535 co...

Страница 23: ...Pg 23 TB PMP Notes...

Страница 24: ...Service Date 07 17 Version 1 TaskMaster from ILSCO 4730 Madison Rd Cincinnati OH 45227 Phone 800 776 9775 513 533 6200 www ilsco com...

Отзывы: