Accessories

A 11.1 

Beater 1.4034) 

A 11.5  Grinding container 80 ml

A 11.2 

Cutting blade (1.4112) 

A 11.6  Double beater

A 11.3 

Beater (1.4112) 

A 11.7  Filling funnel

A 11.4 

Grinding container 250 ml

Note on grinding beaker A 11.5:

Grinding cup made of Tefzel (ETFE). This fluorine plastic (similar to Teflon) possesses 
excellent resistance to chemicals and is temperature-resistant from -200°C to +150°C 
(ideal for direct cooling with liquid nitrogen).
Color and structure flaws on the outside of the beaker are due to manufacturing 
and do not affect the quality of the beaker.

The following instructions must be observed when using the large grinding 

container A 11.4 (effective volume 250 ml):

Use double beater A 11.6 for crushing in grinding beaker A 11.4.
The double beater is screwed onto the drive shaft. Hold the drive shaft in place 
using a single head wrench a/f 7. Using another single head wrench a/f 7, which is 
attached to the two flats of the double beater shaft, screw the double beater until 
it is hand - tight.
Please ensure that the off - drive shaft in the thread area is free from dust and mill 
feed deposits.

Filling height:

The maximum filling height, shown in figure 5, must not be exceeded (about 20 
mm below the stainless steel upper edge). Otherwise the drive may overheat.
Furthermore, good grinding results cannot be expected (a wide range of granularity). 
What has been said before also applies here: (for example, only 50 - 80% of
the normally filling quantity) are reduced more quickly, the granularity of the final 
product is finer, the range of granularity is smaller and the heating up of the 
grinding material is reduced.

Grinding process:

As the double beater is already immersed in the mill feed when the grinding beaker 
is being screwed on, it is important that the sample is well shredded (maximum 
particle size ø 7 mm) so that the grinding beaker can be screwed on properly.
The hardness of the feed product must not exceed 3 Mohs (medium hardness, 
e.g. calcite), otherwise this will put too much strain on the beater, causing it to 
wear out quickly.
When you switch on the appliance at the On/Off button, the drive will be pushed 
down slowly (see section on starting up). Once the grinding process is complete 
(usually after approx. 30 seconds), raise the drive and switch off the appliance at 
the On/Off button.

Wait until the motor stops before unscrewing the grinding 
beaker.

Do not use liquid nitrogen to cool the sample in grinding beaker A 11.4. You can 
use dry ice for cooling purposes, however, please ensure that the cooled mill feed 
does not clump together (this is likely to happen with moist mill feed in particular).

Note:

 If you do not adhere to the maximum fill level and maximum mill feed 

hardness, the high starting torque of the grinding beaker may cause the grinding 
beaker to open by up to half a revolution and the analytical mill will switch off 
automatically.

CAUTION

Содержание A11 basic

Страница 1: ...Operating instructions EN IKA A11 basic ...

Страница 2: ...on Maximale Füllhöhe Maximum filling height Fig 1 Fig 2 IKA A11 basic On Off Fig 3 20 Maximale Füllhöhe Maximum filling height Fig 5 Fig 6 On Off IKA A11 basic 22 9 8 24 14 13 20 19 11 Item Designation 8 Guard ring 9 O ring 11 Beater 13 Hexagonal nut 14 Pressure spring 19 O ring 20 Seal 22 Guide screw 24 Hexagonal nut ...

Страница 3: ...3 STEP 2 Unscrew STEP 3 Remove STEP 4 Clean DRY WET Tools 2x 2x 1x STEP 1 Check Cleaning information IKA A 11 basic Note Prevent damage keep clean ...

Страница 4: ...to all IKA S versions e g A 11 basic S 001 EN Safety instructions Explication of warning symbols DANGER CAUTION WARNING NOTICE Indicates an imminently hazardous situation which if not avoided will result in death serious injury Indicates a potentially hazardous situation which if not avoided can result in death serious injury Indicates a potentially hazardous situation which if not avoided can res...

Страница 5: ...d it in place with both hands Only process samples that will not react dangerously to the extra energy produced through processing This also applies to any extra energy produced in other ways e g through light irradiation Beware of the risk of flammable materials Working with the device DANGER Do not use the device in explosive atmospheres it is not EX protected With substances capable of forming ...

Страница 6: ...trade or industry The safety of the user cannot be guaranteed if the device is operated with accessories that are not supplied or recommended by the manufacturer if the device is operated improperly or contrary to the manufacture s specifications if the device or the printed circuit board are modified by third parties Power supply switching off the device The voltage stated on the type plate must ...

Страница 7: ...more than 50 capacity The mill must only be used in an upright position in this case must not be agitated or turned on its head Materials that are not listed above should only be reduced in the A 11 basic after confirmation from IKA especially if there is uncertainty about the danger of explosion dust explosion as a result of electrostatic charge NOTICE WARNING Unpacking Delivery scope A 11 basic ...

Страница 8: ... grinding beaker Pour liquid nitrogen into the grinding beaker using a suitable Dewar vessel ensuring that the sample is completely covered or swimming in liquid nitrogen Only attach the drive once the nitrogen is completely vaporized otherwise high pressure can build up in the grinding chamber Please note that the mill feed heats up again extremely quickly during crushing it may reach room temper...

Страница 9: ...y grinding material that adheres to the guard ring can be swept off on the guard ring into the grinding container with a cleaning brush no wire brushes Always remove any grinding scrap which gets into the interstice before using the appliance again see Maintenance and Cleaning section The grinding tools the grinding container and the rotor shaft may be hot Observe the safety instructions WARNING C...

Страница 10: ...does not indicate which of the two possible errors has occurred As a rule if the motor circuit breaker has been engaged an elevated temperature has been detected on the mill housing Temperature and over current protection The A 11 basic mill is protected from overload and or overheating by a combined temperature and over current switch The motor circuit breaker turns itself back off automatically ...

Страница 11: ...emove the grinding container If fragments of the grinding material have become stuck between the grinding tool and the guard ring do not remove them until after you have disconnected the power cord Eliminating malfunctions The mill does not start up Causes Power cord is not plugged into the socket correctly You did not push the On Off switch down far enough The grinding container is not screwed in...

Страница 12: ...tion area can be cleaned with a cleaning brush If there is a heavy accumulation of dirt the grinding container can be cleaned in a dish washer If grinding dust is found in the middle section the area where pressure spring is located it can be blown out through the opening with compressed air If there is a heavy accumulation of dirt on the guard ring and the middle section can be disassembled as fo...

Страница 13: ... matching opening in the middle section For the switch block to engage completely in place the drive section must be pushed into the middle section up to the lower stop While the drive sections is inserted about half way into the middle section the guide screws should be tightened Note The switch block must engage flush in the middle section in the assembled state This should always be checked and...

Страница 14: ...ange of granularity What has been said before also applies here for example only 50 80 of the normally filling quantity are reduced more quickly the granularity of the final product is finer the range of granularity is smaller and the heating up of the grinding material is reduced Grinding process As the double beater is already immersed in the mill feed when the grinding beaker is being screwed o...

Страница 15: ... beaker A 11 4 250 ml Rotor shaft Beater A 11 1 Cutter A 11 2 Beater A 11 3 Double beater A 11 6 Filling funnel A 11 7 Stainless steel 1 4571 outer shell fluoroplastic ETFE Stainless steel 1 4571 outer shell polycarbonate PC Stainless steel 1 4571 Stainless steel 1 4034 hardness approx 52 HRC Stainless steel 1 4112 hardness approx 55 HRC Stainless steel 1 4112 wolfram carbide coated core hardness ...

Страница 16: ...may also send the machine direct to our factory enclosing the delivery invoice and giving reasons for the claim You will be liable for freight costs The warranty does not cover worn out parts nor does it apply to faults resulting from improper use insufficient care or maintenance not carried out in accordance with the instructions in this operating manual ...

Страница 17: ...IKA Works Guangzhou Phone 86 20 8222 6771 eMail info ika cn POLAND IKA Poland Sp z o o Phone 48 22 201 99 79 eMail sales poland ika com USA IKA Works Inc Phone 1 910 452 7059 eMail usa ika net KOREA IKA Korea Ltd Phone 82 2 2136 6800 eMail sales lab ika kr BRAZIL IKA Brazil Phone 55 19 3772 9600 eMail sales ika net br VIETNAM IKA Vietnam Company Limited Phone 84 28 38202142 eMail sales lab vietnam...

Отзывы: