![IHP Superior WRE6842RS Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/ihp/superior-wre6842rs/superior-wre6842rs_assembly-installation-and-operation-instructions_4143841012.webp)
Superiorfireplaces.US.com
127011-01B
12
VENTING INSTALLATION
Continued
Terminations/Spark Arrestor
The fireplace system must be terminated with the listed round top or
chase terminations. In any case, refer to the installation instructions
supplied with the termination.
CAUTION: Do not seal openings on the rooftop
flashing. Follow the installation instructions provided
with the termination being used.
24" Min.
24" Min.
18"
Min.
Typ.
Figure 18 - Multiple Chase Installation
10'
2' Min.
10'
3' Min.
2' Min.
3' Min.
Level of
Flue Gas
Outlet
Figure 19 - 10 Foot Rule
Figure 17 - Termination
RLT-12D
Level of
Flue Gas
Outlet
Stainless
Inner Flue
Pipe
Waterproof
Caulking
Storm
Collar
Flashing
Underlap
Shingles
Overlap
Shingles (Top
and Sides of
Flashing Base)
Secure
Termination
to Outer
Pipe with 3
Screws
CHASE INSTALLATIONS
Instructions for chase installations are included with the chase style
termination chosen. In a multiple chase installation, be sure to provide
adequate distance between terminations to prevent smoke spillage
from one termination to another. We suggest that terminations be
separated at least 24", center to center and stacked at a vertical height
difference of 18" (see Figure 18).
Note: If a decorative shroud is to be installed, contact the manufacturer
for specifications.
10 FOOT RULE
All flue gas outlet chimney terminations must extend a minimum of
3 feet in height above the highest point where it passes through the
roof and must be at least 2 feet above the highest point of the roof
that is within a horizontal distance of 10 feet (see Figure 19).
FINISHING FIREPLACE
Combustible materials, such as wallboard, sheet rock, drywall, plywood,
etc. may make direct contact with sides and top around the fireplace
face. It is important that combustible materials do not overlap the face
itself. Brick, glass, tile or other noncombustible materials may overlap
the front face provided they do not obstruct essential openings like
louvered slots or any other opening. When overlapping with a noncom-
bustible facing material, use only noncombustible mortar or adhesive.