
OPERATION
IC75-2 ENG
3-9
“BREAK-IN” OPERATION
NOTICE
If a new machine is used in severe conditions, its
performances are deteriorated early and the
service life becomes shorter. Break in a new
machine for about 100 hours first.
Pay attention to the following when breaking in a new
machine.
•
Warm up the machine sufficiently.
•
Do not start or accelerate quickly or stop
unnecessarily. Do not change the direction quickly.
•
Do not apply heavy loads to the machine or run it at
high speed.
Run the machine at approximately 80% of the
maximum engine speed.
Place loads of approximately 80% of the maximum
loading capacity.
Warm-up operation