
OPERATION
3‑12LOADINGANDUNLOAD[NGTHEMACHINE
*Setthetravelspeedse[ectswitchtoLOWbeforeloadingthemachine.
NEVERoperatethisswitchwhenIoadingthemachineonatraHer.
*Chooseasflatgroundaspossiblefor「oadingorunloadingthemachine.
*Whenusingloadingramps,besurethereisadequateIength,width,
firmnessandsbpe.
*Topreventthemachinefromslippingwhileloading,orshiftingintransit,
removeice,snoworotherslipperymateria!fromtheloadingdockandthe
truckbedbeforebading.
*Performwarm・upbeforeIoadingandunloadingundercoldweather.
*NEVERmakeatumontheioadingramps.Tomakeaturn,getoftthe
machinefromtheloadinglampfirst,
1.Blockthetrai[erwheelsbefore]oading.
2.lnsta1ほhebadinglampstothetrai]er
securely.
3.Maintainthesbpeof[oadingramps
within15degrees.
4.Thebodyhas【owercomp[etelyand
positiontheoperatorstationtoforvvard.
5.Positionthemachinesothatitcanbe
runstraightonthebadingramps.Never
operatecontrdieversotherthanthe
traveHoverwhilethemachineisonthe
loadingramps.
6.Maintainthemachinebalancepoint
whi[etrave[ingovertheIoadingramp
jointareas.
7.Movethegatebck]evertothe
LOCKEDposition.
8.TumtheenglnestartswitchkeytoOFF
tostoptheengineandremovethekey.
9、Lockthedooraccesscoversand
l
attachanyvandalismprotection.
10.Blockthetracksandsecurethe
machinewithtiedowns.Forthis
purpose,withproperratedwirerope
cab]e,usethefrontandreareyeson
thelowerframeandtowingeyes
めcatedinfrontandrearofthe[ower
frame.
○
Max.15degrees
Bbcks
雫
穫、、夕Blocko」胃男Block
WireropePadding
3‑28